My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM 1 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
AECOM 1 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 11:58:03 AM
Creation date
4/6/2011 11:51:22 AM
Metadata
Fields
Template:
Contracts
Company Name
AECOM
Contract #
A-2011-024
Agency
PUBLIC WORKS
Council Approval Date
1/18/2011
Expiration Date
1/1/2013
Insurance Exp Date
4/1/2014
Destruction Year
2021
Notes
Amended by A-2011-024-01, -02, -03
Document Relationships
AECOM (FORMERLY DMJM HARRIS) 1A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1B - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
AECOM (FORMERLY DMJM HARRIS) 1C - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br />9 <br />This superstructure alternative will require shoofly tracks, <br />station modifications, and detoured traffic to isolate the <br />bridge site completely for construction. This alternative <br />proposes to construct a railroad bridge by lowering the Santa <br />Ana Boulevard. Atwo-Span Structure Alternative would work <br />very well at this location. This proposed double track railroad <br />bridge structure is approximately 126.7 feet long and 40.3 <br />feet wide, with no skew to Santa Ana Boulevard. A Pier Bent <br />is needed in the median of Santa Ana Boulevard, which will <br />result in the maximum span length of 63.3 feet, and therefore <br />a SCRRA Standard Precast/Prestressed (PC/PS) Double <br />Cell Box Girder Structure can be used for the structure <br />type. Attention is directed to General Plan — PC/PS Con Box <br />Alternative, Figure 5. <br />A precast, simply supported structure is the preferred <br />railroad bridge type because of its flexibility for repair and <br />replacement in the future. Significant shoring would be <br />required around the construction area when constructing the <br />bridge. Retaining walls would be required for the roadway <br />depression. In order to facilitate the traffic staging/handling <br />during the construction, the walls constructed parallel to <br />Santa Ana Boulevard could be constructed using "top-down" <br />construction, <br />Utility Relocations <br />Always a significant concern on any grade separation due <br />to the impact to existing facilities, AECOM takes a tried and <br />trued approach to coordinating these efforts. This starts with <br />our current relationships that we have developed on past <br />projects with each of the utility companies, which allows us <br />to understand each of their needs, to develop a strategy for <br />their relocation, and to address impacts both during and after <br />construction. <br />The key is to be proactive, meeting early and often, and <br />disseminating the project information to each utility <br />company. AECOM will develop a conceptual relocation plan <br />and refine this further with input from the utility companies. <br />No one will know the impacts and obstructions to be <br />encountered better than our designers, and it is up to us to <br />convey this information to the utility companies. Our goal <br />will be to provide a single relocation, when feasible, for each <br />utility within the project site. We have effectively achieved <br />this on past projects through the use of: <br />Utility Corridors: Utilize easements or acquired right-of- <br />way outside the Santa Ana Blvd, footprint, combining with <br />access roadways to better utilize space. The utility corridor <br />allows for a single relocation of each utility, eliminating the <br />need for temporary relocations, especially as the agency <br />typically wit[ bear the cost of one of these relocations. This <br />will be the preferred method, especially with City owned land <br />on the south side, as well as many utilities already located <br />within the old Fruit Street right-of-way, outside of the grade <br />separation improvements. <br />Temporary Shutdowns: Early discussions with the utility <br />companies, especially water and gas, might yield the fact <br />that particular pipelines may be taken out of service during <br />construction due to adequate redundancy in the system or <br />the ability to backfeed the service to the end users. <br />Construction Staging: Where a utility corridor is not <br />feasible and services must remain in service, construction <br />staging must account for both the existing and permanent <br />location of the utilities to ensure continual service. With <br />the staged construction approach on this project, this <br />is a feasible approach, though it may require temporary <br />relocations to clear the stage one construction. <br />relocation plans for grade separations <br />i Proposal for Project S; o=p Report Equivalent and Conceptual Engineering Plans for <br />Santa Ana Bouteva d G:3oe Separation Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.