My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE P 2 - 2011
Clerk
>
Contracts / Agreements
>
P
>
PLANNING CENTER, THE P 2 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:21:08 PM
Creation date
4/6/2011 3:47:04 PM
Metadata
Fields
Template:
Contracts
Company Name
THE PLANNING CENTER
Contract #
A-2011-049
Agency
PLANNING & BUILDING
Council Approval Date
3/7/2011
Insurance Exp Date
7/1/2011
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />the project area. Staff at the City of Santa Ana will be consulted to identify the intersections that will be <br />evaluated. The future baseline traffic volumes will be forecast by considering the effects of general area-wide <br />growth and the cumulative volumes of traffic that would be generated by other proposed development projects <br />Ef in the area. <br />The impacts of the proposed project will be determined by estimating the levels of traffic that the activities at <br />the athletic fields and park would generate then conducting a before-and-after analysis of traffic conditions on <br />the streets and intersections in the site.vicinity (i.e., traffic conditions with and without the proposed project). <br />The volume of traffic that would be generated by the athletic fields and park will be based on the trip generation <br />rates from the institute of Transportation Engineers' Trip Generation manual. The traffic analysis will address the <br />project's impacts during the afternoon peak period on a typical weekday and on a weekend day. The analysis <br />will also address the anticipated parking impacts of the proposed project. <br />Potential measures for mitigating the adverse fraMc and parking impacts (if any) will be identified -in <br />consultation with the City of Santa Ana. The analysis methodology, assumptions, and findings will be <br />summarized in report sections suitable for insertion into the environmental document. <br />Air Quality <br />Potential air quality impacts associated with construction and operation of the project will be analyzed in the <br />EIR. The analysis will be based on the South Coast Air Quality Management District's (SCAQMD) methodology for <br />projects in the South Coast Air Basin (SoCAB). Air pollutant emissions will be quantified using the CALEEMQD <br />computer model for both the construction and operational phases. Construction modeling will be based on <br />construction phasing, the construction schedule, and anticipated equipment for each type of construction <br />activity. Air pollutant emissions will be compared to SCAQMD's regional thresholds of significance to determine <br />the significance of project-related construction emissions due to the expansion of the stadium and <br />reconfiguration of the athletic field. Onsite localized project-related emissions associated with vehicle exhaust <br />and dust generated during the construction phase will also be evaluated against SCAQMD's screening-level <br />localized significance thresholds (LSTs) for projects under five acres to determine whether sensitive residential <br />uses along local roadways would be exposed to air pollution that exceeds the ambient air quality standards <br />(AAQS). Project-related emissions will also be evaluated relative to consistency with the air quality management <br />plan. <br />Greenhouse Gas Emissions <br />The EIR will quantify greenhouse gas (GHG) emissions for area sources, energy (purchased energy, energy from <br />water transport, use, and treatment), waste disposal, and transportation emissions sources generated by the <br />project. The potential effects of GHG emissions, history of GHG emissions regulation in California, and project- <br />related GHG emissions will be discussed. Project consistency with the CARB Scoping Plan's statewide GHG <br />emissions reduction strategies will also be reviewed. <br />Noise and Vibration <br />The existing field is currently used for physical education and sporting events during daylight hours. With the <br />r <br />+ addition of lights, the field and courts will be used during evening hours, which will increase noise levels until <br />closing, which is likely to be 10.00 PM. For the purposes of this scope, we assume that no bleachers will be <br />installed onsite and amplified sounds systems will not be allowed. <br />The CEQA document will evaluate potential impacts resulting from the construction and operation of the <br />project. The noise analyses will be consistent with the.noise compatibility standards of the District and the City <br />of Santa Ana. The short-term construction analyses will focus on potential noise and vibration impacts on <br />sensitive land uses such as the onsite school classrooms and local residential uses. Based on the anticipated <br />construction schedule and equipment list, construction-related noise and vibration levels will be calculated for <br />THE PLANNING CENTER I PRO?OSAL VJUI AR__ VJERMEDIATESC.i1U0LATtiL_TI FI GI}/?ROV;!!E '.
The URL can be used to link to this page
Your browser does not support the video tag.