My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - LED STREET LIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
19C - RFP - LED STREET LIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 1:18:10 PM
Creation date
4/14/2011 3:30:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19C
Date
4/18/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PURPOSE <br />The purpose of this Request for Proposals (RFP) is to obtain a Proposer to enter an agreement <br />with the City to remove existing street light luminaires, furnish and install energy efficient LED <br />streetlight luminaires on two (2) arterial streets; Main Street and Edinger Avenue. The Proposer <br />will be required to provide two - hundred fifty -three (253) LED street light luminaires. The City <br />reserves the right to increase or decrease the quantity of lights. <br />I. SCOPE OF WORK <br />The Request for Proposals calls for the removal and disposal of existing luminaires; the <br />furnishing and installing of new LED street lights and all testing, including photometric, to prove <br />that furnished luminaires perform as specified. <br />The Contractor shall provide at his own risk and cost all labor, materials, tools, equipment, and <br />traffic control per the Work Area Traffic Control Handbook ( "WATCH "), transportation, <br />hauling, dumping, and recycling of removed material as part of this project. The City reserves <br />the right to salvage existing luminaires. All salvaged luminaires shall be delivered to the City <br />Corporate Yard at no cost to the City. <br />II. FUNCTIONS AND RESPONSIBILITIES <br />A. DIRECTOR <br />The Director shall have the authority to accept/reject materials, workmanship and to make <br />minor changes in work or schedule. When the performance of the work or completion per <br />schedule is determined to be substandard, he may 1) recommend that all or a portion of <br />payment be withheld, and /or forfeiture for delay be assessed; 2) direct the work be <br />accomplished by a separate contractor, in order to complete the necessary work as close to <br />schedule as possible and withhold the resulting costs. Payment to be withheld shall be <br />deducted from the next monthly payment due to the Proposer, or if the amount is insufficient <br />to cover payment, the Proposer shall be liable and will be billed accordingly. <br />The Director or his authorized representative shall decide all questions, which may arise as to <br />the manner of performance and completion per schedule, acceptable fulfillment of the <br />contract by the Proposer, interpretation of the specifications, and compensation to include <br />completion of work by alternate sources. <br />B. PROPOSER <br />1. Local Office <br />The Proposer shall maintain a local office with a competent representative who can be <br />reached during normal working hours and authorized to discuss matters pertaining to this <br />2 <br />19C -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.