My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19D - RFP - PRE-PRELIMINARY ENGINEERING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
19D - RFP - PRE-PRELIMINARY ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:46:51 PM
Creation date
4/14/2011 3:30:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
19D
Date
4/18/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. SCOPE OF WORK <br />Task 1 - New Starts Templates and Application <br />A significant amount of work in support of the project has recently been prepared <br />through the Conceptual Engineering/Alternatives Analysis/Draft Environmental Analysis <br />effort. At project kick-off, City of Santa Ana staff will provide Consultant with copies of <br />the documents that provide information relevant to the Pre-PE scope of work. For <br />efficiency and consistency, Consultant shall draw from those materials to the maximum <br />extent feasible to prepare and assemble all documents and data needed for an FTA <br />Section 5309 (New Starts/Small Starts/Urban Circulator) application, including: <br />A. Project Description <br />B. Standard Cost Categories (SCC) Annualized Cost Worksheets <br />C. Land Use Supporting Information <br />D. Project Financial Plan & Supporting Information <br />E. "Making the Case" Document <br />Task 1 Deliverables: <br />1. One electronic version (on CD in Microsoft Office Word 2007 or Microsoft <br />Office Excel 2007 format) and 12 hard copies of the draft Project Description, <br />SCC Annualized Cost Worksheets, Land Use Supporting Information, Project <br />Financial Plan & Supporting Information, and "Making the Case" Document <br />2. One electronic version (on CD in Microsoft Office Word 2007 or Microsoft <br />Office Excel 2007 format) and 12 hard copies of the final Project Description, <br />SCC Annualized Cost Worksheets, Land Use Supporting Information, Project <br />Financial Plan & Supporting Information, and "Making the Case" Document <br />Task 2 - Project Management Plan (PMP) <br />As a condition of Federal assistance, a grant applicant for a major capital investment <br />project must prepare a Project Management Plan (PMP) consistent with 49 USC 5327 <br />(Project Management Oversight) and 49 CFR 633 (Project Management Oversight <br />Rule). The grant applicant must submit the PMP in time for FTA to review the <br />applicant's plan in conjunction with its New Starts/Small Starts grant application. The <br />196-4
The URL can be used to link to this page
Your browser does not support the video tag.