My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - CHANGE ORDER - 55 -MACARTHUR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
23A - CHANGE ORDER - 55 -MACARTHUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:46:52 PM
Creation date
4/14/2011 4:02:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23A
Date
4/18/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number PROJECT NO. 07-2503 - SR-55/MacArthur Boulevard Ramps Change Order Number <br />Widening 1 <br />To Peterson-Chase General Engineering Construction Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />PUBLIC WORKS AGENCY <br />The contract shall be modified per City of Santa Ana PCO Nos. -1 and 2 dated November 30, 2010 and <br />December 30, 2010, respectively and the contract bid items shall be modified as follows: <br />1. REVISED QUANTITIES ON UNIT-PRICED WORK ITEMS <br />Revised Revised <br />Item # Contract Bid Item unit nuantity t Init Prirc rnct <br />8 Temporary Traffic Stripe (Paint) LF 9,870 $0.26 $2,566.20 <br />9 Traffic Plastic Drum EA 287 $50.00 $14,350.00 <br />11 Temporary Railing (Type K) LF 4,427 $11.50 $50,910.50 <br />16 Remove Metal Beam Guard Railing LF 290 $10.00 $2,900.00 <br />17 Remove Roadside Sign EA 8 $100.00 $800.00 <br />18 Remove Asphalt Concrete SF 0 $0.70 $0.00 <br />25 Relocate Roadside Sign - One Post EA 7 $150.00 $1,050.00 <br />26 Relocate Roadside Sign - Two Post EA 0 $800.00 $0.00 <br />33 Roadway Excavation CY 4,737 $23.00 $108,951.00 <br />34 Structural Excavation CY 140 $21.00 $2,940.00 <br />35 Structural Backfill CY 90 $25.00 $2,250.00 <br />38 Temporary Fiber Roll LF 1,620 $2.00 $3,240.00 <br />39 Plant (Group F) EA 554 $1.00 $554.00 <br />40 Plant (Group H) EA 0 $1.40 $0.00 <br />44 Class 2 Aggregate Subbase CY 1,730 $25.00 $43,250.00 <br />45 Class 2 Aggregate Base CY 1,474 $35.00 $51,590.00 <br />46 Asphalt Treated Permeable Base CY 0 $143.00 $0.00 <br />47 Hot Mix Asphalt (Type B) TON 0 $85.00 $0.00 <br />48 Rubberized Hot Mix Asphalt (Gap Graded) TON 1,308 $100.00 $130,800.00 <br />49 Place Asphalt Concrete Dike (Type D) LF 1,411 $6.00 $8,466.00 <br />50 Structural Concrete CY 50 $240.00 $12,000.00 <br />23i+ 13f 4
The URL can be used to link to this page
Your browser does not support the video tag.