My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - CHANGE ORDER - 55 -MACARTHUR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
23A - CHANGE ORDER - 55 -MACARTHUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:46:52 PM
Creation date
4/14/2011 4:02:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23A
Date
4/18/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number PROJECT NO. 07-2503 - SR-55/MacArthur Boulevard Ramps Change Order Number <br />Widening 1 <br />To Peterson-Chase General Enqineerinq Construction Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested PUBLIC WORKS AGENCY <br />by <br />Item # New Bid Items Unit nimntity t Init Prim rnct <br />82 Cold Mill AC - .2' max SF 96,034 $0.34 $32,651.56 <br />83 Remove K-Railing LF 3,719 $4.90 $18,223.10 <br />84 3" Plastic Pipe (Edge Drain) LF 1,094 $34.50 $37,743.00 <br />85 3" Plastic Pipe (Edge Drain Outfall) LF 52 $81.00 $4,212.00 <br />86 Metal Beam Guard Rail (12A Layout) LF 38 $110.00 $4,180.00 <br />87 Transition Railing EA 1 $5,300.00 $5,300.00 <br />88 Free Import Compaction <br />$50,000.00 <br />89 Import Soil (R20) Load 258 $218.40 $56,347.20 <br />91 Irrigation Modification LS 1 $10,590.00 $10,590.00 <br />92 Electrical Modification (PCO 1) LS 1 $51,570.00 $51,570.00 <br />93 Electrical Modification (PCO 2) LS 1 <br />$100,000.00 <br />The contractor shall be paid actual quantities installed per the existing contract bid items and <br />the new bid items established by this change order. <br />! <br />! <br />! <br />! <br />! <br />2 Sage
The URL can be used to link to this page
Your browser does not support the video tag.