My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - DT GENERAL MAINT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
25A - AGMT - DT GENERAL MAINT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:46:53 PM
Creation date
4/14/2011 4:02:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25A
Date
4/18/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />ANNUAL CITY GUARDRAIL, CHAIN LINK FENCE, <br />BLOCK WALL AND TRAFFIC' BOLLARD REPAIR' CONTRACT <br />FISCAL YEAR 2010-2011 <br />BID & CONTRACT AGREEMENT <br />TYPICAL REPAIR SCENARIOS (cont.) <br />For bidding purposes please provide prices for the repair work described below, <br />B. CHAIN' LINK FENCING <br />An errant driver has destroyed 20LF (2 Panels) of 6' high chain link fencing 'located on a vacant <br />City lot. Please prepare a lump sum bid for its repair based on the following items and all <br />applicable requirements per Santa Ana Improvement Standard No. 310. <br />1. Disposal of all destroyed fencing including 3 - 2'-6"x 8"x 8" concrete footings. <br />2. Furnish and install: 3 -8'L x 1-1/2" Dia. Galt'. Stl. Line Posts w/caps. <br />2 -101 x 1-1/4" Dia. Galy. Stl. Pipe Top Rails <br />20 LF of 9 GA. 2" Mesh 60" Chain Link Fabric <br />40 LF of 7 GA. Spring Steel Tension Wire w/ 9 GA. Wire Ties <br />Repair damage to chain link fencing described above ................................LS = <br />C. GUARDRAIL <br />On northbound Fairview Street, between First and Willits Streets, a section of guardrail has been <br />damaged (See photo next page). Please prepare a lump sum bid for its repair based on the <br />following items and all applicable requirements per Santa Ana Improvement Standard No. 1114. <br />1. Disposal of all destroyed material including: 1-12'-6"L metal beam guard rail & spade end <br />3- 8" x 8" x 5" posts and concrete. footings <br />2. Furnish and install: 1-12'-6" metal beam guardrail <br />1 -terminal end section <br />3 - 8" x 8" x 5' pressure treated posts w/concrete footings <br />Metal Beam Guardrail Element ..................... or Individual Unit Price $ '/ . <br />Terminal End Section... ........................Individual Unit Price= $ <br />Pressure Treated Posts w/Concrete Footings............Individual Unit Price = $ <br />Metal Posts, ............... : ....... ................................... Individual Unit Price $ /?;'o <br />(*Pricing shall include all installation accessories e A bolts nuts and other fitting <br />Repair Damage to Guardrail Scenario Described Above" ..........................:LS = $17-` <br />(TO BE INCLUDED WITH BID PACKAGE) <br />2 of 16 <br />EXHIBIT A-1 <br />25A-13
The URL can be used to link to this page
Your browser does not support the video tag.