My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-04-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
FULL PACKET_2011-04-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 1:18:05 PM
Creation date
4/18/2011 3:37:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/18/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
780
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />ANNUAL CITY GUARDRAIL, CHAIN LINK FENCE, <br />BLOCK WALL AND TRAFFIC BOLLARD REPAIR CONTRACT <br />FISCAL YEAR 2010-2011 <br />BID & CONTRACT AGREEMENT <br />TYPICAL REPAIR SCENARIOS (cont.) <br />For bidding purposes please provide prices for the repair work described below, <br />B. CHAIN LINK FENCING <br />An errant driver has destroyed 20LF (2 Panels) of 6' high chain link fencing located on a vacant <br />City lot. Please prepare a lump sum bid for its repair based on the following items and all <br />applicable requirements per Santa Ana Improvement Standard No. 310. <br />1. Disposal of all destroyed fencing including 3-2'-6"x,8 "x 8" concrete footings, <br />2. Furnish and install: 3 —8'Lx 1-1/2" Dia. Galt'. 8tl, Line Posts w/caps. <br />2 —101 x 1 -1/4" Dia. GaIv. StI. Pipe Top Rails <br />20 LF of 9 GA. 2" Mesh 60" Chain Link Fabric <br />40 LF of 7 GA. Spring Steel Tension Wire w/ 9 GA. Wire Ties <br />Repair damage to chain link fencing described above ... .............................LS = <br />C. GUARDRAIL <br />On northbound Fairview Street, between First and Willits Streets, a section of guardrail has been <br />damaged (See photo next page). Please prepare a lump sum bid for its repair based on the <br />following items and all applicable requirements per Santa Ana Improvement Standard No. 1114. <br />1. Disposal of all destroyed material including: 1- 12' -6 "L metal beam guard rail & spade end <br />3- 8" x 8" x 5" posts and concrete. footings <br />2. Furnish and install: 1- 12' -6" metal beam guardrail <br />1 —terminal end section <br />3 — 8" x 8" x 5' pressure treated posts w/concrete footings <br />Metal Beam Guardrail Element ..................... or Individual Unit Price $ <br />Terminal End Section... ............... ......... ............. ... Jndividual Unit Price $ <br />4-Z <br />Pressure Treated Posts w/Concretefootings ............ Individual Unit Price = $ <br />Metal Posts, ............... : ....... ................................... Individual Unit Price $ /�;'o <br />( *Pricing shall include all installation accessories , eA bolts, nuts and other fittings) <br />Repair Damage to Guardrail Scenario Described Above* ............ * ............. :]_S; = $174.f-` <br />(TO BE INCLUDED WITH BID PACKAGE) <br />2 of 16 <br />EXHIBIT A-1 <br />25A -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.