My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-04-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
FULL PACKET_2011-04-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 1:18:05 PM
Creation date
4/18/2011 3:37:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/18/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
780
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conformity to standards and NIMS guidelines. Findings from evaluations may be <br />accessed through the Responder Knowledge Base (RKB) website to assist grantees in <br />making purchases. More information on the NIMS STEP can be found at <br />https : / /www.rkb.us /contentdetaii.cfm ?content id= 219711. <br />For detailed standards information, please see the Recommended Guidance for Federal <br />Grant Programs (SAFECOM Guidance for Grant Programs) available at <br />www.safecompro-gram.gov. <br />IECGP funds should be used for activities that include, but are not limited to, the <br />following: <br />Development of communications system life -cycle plans. Emergency <br />response providers must upgrade and regularly maintain communications <br />systems and capabilities to ensure effective operation. System life -cycle <br />planning is needed to ensure long -term sustainability of communications systems <br />and infrastructure. Grantees are required to provide a system life -cycle plan for <br />any communications system purchased with IECGP funding and may use <br />funding for costs associated with the development of a system life -cycle plan. <br />Equipment Purchases and Related Costs. If an SAA and SWIC /SCIP POC <br />certifies that its State, territory, or pass- through recipient has fulfilled all of the <br />objectives of Priority Groups one and two, the State, territory, or pass- through <br />recipient has the flexibility to purchase interoperable communications equipment <br />with any remaining IECGP funds. When making equipment purchase decisions, <br />grantees should take into account multi - disciplinary and multi - jurisdictional <br />needs. IECGP funds may be used for costs associated with the following— <br />a. Design, implementation, enhancement, replacement, and <br />maintenance of emergency response communications systems <br />and equipment <br />b. Migration to approved open architecture and interoperable next <br />generation systems, where appropriate <br />c. Leveraging of existing and emerging technologies to expand and <br />integrate disaster communications capabilities among emergency <br />response providers <br />d. Governance, development of policies and procedures, and the <br />conduct of training and exercises needed for use of systems and <br />equipment <br />e. Transition of equipment and systems to narrowband operation <br />f. Costs associated with maintaining existing equipment, including, <br />storage, calibration, maintenance and testing of strategic reserve <br />equipment; and cellular and satellite airtime for equipment used <br />for emergency response only <br />States that are using FY 2010 IECGP funds to purchase Interoperable Communications <br />Equipment (Category 6) must consult SAFECOM's coordinated grant guidance which <br />21 <br />55A -27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.