My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-04-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
FULL PACKET_2011-04-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 1:18:05 PM
Creation date
4/18/2011 3:37:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/18/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
780
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concurrence on any proposed refinements to OCTAM and, if necessary, develop travel <br />surveys and analyze travel forecasting uncertainties to support the proposed approach <br />to developing Santa Ana - Garden Grove fixed guideway system ridership forecasts. The <br />final report shall detail any post - processing or "off- model" work that was completed and <br />include ridership forecast for Task 8, FTA Summit Analysis. <br />Task 7 Deliverables: <br />1. One electronic version (on CD in Microsoft Office Word 2007 or Microsoft <br />Office Excel 2007 format) and 12 hard copies of the draft ridership forecasts <br />2. One electronic version (on CD in Microsoft Office Word 2007 or Microsoft <br />Office Excel 2007 format) and 12 hard copies of the final ridership forecasts <br />Task 8 — FTA Summit Analysis <br />Using the FTA Summit software, Consultant shall determine Transportation System <br />User Benefits for reduced the set of "Build" and "No Build" alternatives selected for the <br />Santa Ana - Garden Grove fixed guideway project. This information shall be presented in <br />a report that includes: <br />A. Thematic Maps for each of the Build Alternatives versus the Baseline Alternative <br />B. Production & Attraction Maps for Each Trip Purpose & Period <br />C. Daily Totals <br />Additional inputs and outputs from Summit, such as trip length frequency reports and <br />row and column sum outputs, shall also be provided. <br />Task 8 Deliverables: <br />1. One electronic version (on CD in Microsoft Office Word 2007 or Microsoft <br />Office Excel 2007 format) and 12 hard copies of the draft Thematic Maps for <br />Each of the Build Alternatives versus Baseline, Production & Attraction Maps <br />for Each Trip Purpose & Period, and Daily Totals <br />2. One electronic version (on CD in Microsoft Office Word 2007 or Microsoft <br />Office Excel 2007 format) and 12 hard copies of the final Thematic Maps for <br />Each of the Build Alternatives versus Baseline, Production & Attraction Maps <br />for Each Trip Purpose & Period, and Daily Totals <br />15 <br />19D -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.