My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-04-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
04/18/2011
>
FULL PACKET_2011-04-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 1:18:05 PM
Creation date
4/18/2011 3:37:21 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/18/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
780
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number PROJECT NO. 07 -2503 — SR -55 /MacArthur Boulevard Ramps Change Order Number <br />Widening 1 <br />To Peterson -Chase General Engineering Construction Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />PUBLIC WORKS AGENCY <br />The contract shall be modified per City of Santa Ana PCO Nos. -1 and 2 dated November 30, 2010 and <br />December 30, 2010, respectively and the contract bid items shall be modified as follows: <br />1. REVISED QUANTITIES ON UNIT - PRICED WORK ITEMS <br />Revised Revised <br />Item # Contract Bid Item unit nuantity t Init Prirc rnct <br />8 <br />Temporary Traffic Stripe (Paint) <br />LF <br />9,870 <br />$0.26 <br />$2,566.20 <br />9 <br />Traffic Plastic Drum <br />EA <br />287 <br />$50.00 <br />$14,350.00 <br />11 <br />Temporary Railing (Type K) <br />LF <br />4,427 <br />$11.50 <br />$50,910.50 <br />16 <br />Remove Metal Beam Guard Railing <br />LF <br />290 <br />$10.00 <br />$2,900.00 <br />17 <br />Remove Roadside Sign <br />EA <br />8 <br />$100.00 <br />$800.00 <br />18 <br />Remove Asphalt Concrete <br />SF <br />0 <br />$0.70 <br />$0.00 <br />25 <br />Relocate Roadside Sign - One Post <br />EA <br />7 <br />$150.00 <br />$1,050.00 <br />26 <br />Relocate Roadside Sign - Two Post <br />EA <br />0 <br />$800.00 <br />$0.00 <br />33 <br />Roadway Excavation <br />CY <br />4,737 <br />$23.00 <br />$108,951.00 <br />34 <br />Structural Excavation <br />CY <br />140 <br />$21.00 <br />$2,940.00 <br />35 <br />Structural Backfill <br />CY <br />90 <br />$25.00 <br />$2,250.00 <br />38 <br />Temporary Fiber Roll <br />LF <br />1,620 <br />$2.00 <br />$3,240.00 <br />39 <br />Plant (Group F) <br />EA <br />554 <br />$1.00 <br />$554.00 <br />40 <br />Plant (Group H) <br />EA <br />0 <br />$1.40 <br />$0.00 <br />44 <br />Class 2 Aggregate Subbase <br />CY <br />1,730 <br />$25.00 <br />$43,250.00 <br />45 <br />Class 2 Aggregate Base <br />CY <br />1,474 <br />$35.00 <br />$51,590.00 <br />46 <br />Asphalt Treated Permeable Base <br />CY <br />0 <br />$143.00 <br />$0.00 <br />47 <br />Hot Mix Asphalt (Type B) <br />TON <br />0 <br />$85.00 <br />$0.00 <br />48 <br />Rubberized Hot Mix Asphalt (Gap Graded) <br />TON <br />1,308 <br />$100.00 <br />$130,800.00 <br />49 <br />Place Asphalt Concrete Dike (Type D) <br />LF <br />1,411 <br />$6.00 <br />$8,466.00 <br />50 <br />Structural Concrete <br />CY <br />50 <br />$240.00 <br />$12,000.00 <br />23i+ 13f 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.