Laserfiche WebLink
This section documents the analysis for the Opening Year (2013) Without Project conditions. Opening <br />Year (2013) traffic increases were derived using the existing (2010) traffic volumes plus 1% annual <br />growth rate from 2010 to 2013. <br />Opening Year (2013) traffic increases also considers additional traffic that may be generated by other <br />developments that have been approved. KOA and the City identified one relevant project near the <br />project site which will add traffic to the intersections analyzed in the study. Table 2 lists the cumulative <br />project that was analyzed as part of this study per City direction. <br />Table 2 — Cumulative Project <br />D No. <br />Location <br />Project <br />1 <br />1501 West MacArthur Boulevard <br />9,800 square feet of commercial use <br />Source: City of <br />Santa Ana Planning Department. <br />The trip generation and distribution attributed to this cumulative project is documented in Appendix E <br />of this report. The trips generated by the cumulative project are included in the Opening Year (2013) <br />traffic forecast. <br />Figure 5 shows the cumulative project location, <br />KOA CORPORATION updated Main and MacArthur Development Project <br />' PLANNING & ENGINEERING 13 Traffic Impact Study in City of Santa Ana <br />