My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-022 - Addendum to the FInal Environmental Impact Report No. 2004-02
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2011
>
2011-022 - Addendum to the FInal Environmental Impact Report No. 2004-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2014 11:48:24 AM
Creation date
4/22/2011 1:51:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2011-022
Date
4/4/2011
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MacArthur Project Modification — Santa Ana - Air Quality Assessment <br />KPC Environmental, Inc. <br />4.3.3 Additional Indicators <br />Additional indicators to be considered when screening criteria to evaluate the need for <br />further analysis with respect to air quality can be found in the SCAQMD's CEQA <br />Handbook. The additional indicators noted by the SCAQMD are as follows: <br />• Project could interfere with the attainment of the federal or state ambient air <br />quality standards by either violating or contributing to an existing or projected air <br />quality violation. <br />• Project could result in population increases within the regional statistical area <br />which would be in excess of that projected in the AQMP. <br />Project could generate vehicle trips that cause a CO hot spot. <br />• Project might have the potential to create or be subjected to objectionable odors <br />that could impact sensitive receptors. <br />• Project will have hazardous materials onsite and could result in an accidental <br />release of air toxic emissions or acutely hazardous materials posing a threat to <br />public health and safety. <br />• Project could emit an air toxic contaminant regulated by District rules or that is on <br />a federal or state air toxic list. <br />• Project could involve burning of hazardous, medical, or municipal waste as <br />waste -to- energy facilities. <br />• Project could be occupied by sensitive receptors within a quarter mile or an <br />existing facility that emits air toxics identified in District Rule 1401 or near CO <br />hot spots. <br />• Project could emit carcinogenic or toxic air contaminants that individually or <br />cumulatively exceed the maximum individual cancer risk of 10 in 1 million. <br />According to the SCAQMD if the project has significant air quality impacts, an <br />Environmental Impact Report (EIR) should be prepared. If impacts of a project can be <br />reduced to below the emissions significance levels through mitigation, then a Mitigated <br />Negative Declaration (MND) can be prepared. The MND or EIR should use the methods <br />recommended by the SCAQMD and ARB to quantify the levels of emission using the <br />SCAQMD CEQA Handbook, LTRBEMIS, CALINE, and Emfac. All feasible mitigation <br />measures to reduce emission to the lowest possible level should be identified and applied <br />to the greatest extent possible. <br />02/02/11 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.