My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - SECURITY SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
05/02/2011
>
25C - AGMT - SECURITY SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:45:41 PM
Creation date
4/28/2011 11:06:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25C
Date
5/2/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />THE SANTA ANA CORPORATE YARD <br />The Santa Ana Corporate Yard (Yard) is located at 215 South Center Street, Santa Ana, CA <br />92703. The Yard covers 12 acres between First Street on the north, Daisy Avenue on the east, <br />Chestnut Avenue on the south and Center Street on the west. The property includes <br />administrative office buildings, a central stores warehouse, a fleet and facility maintenance two- <br />story garage, and a single-story vehicle parking structure backed up to Chestnut Avenue. The <br />entire property is walled with three security gate entrances. The property houses a variety of the <br />City's vehicle fleet, including street sweepers, large trucks, and standard sedans. The Yard <br />serves as a fuel filling location for City vehicles and houses diesel and unleaded underground <br />storage tanks, and CNG and hydrogen above-ground storage tanks. Security guard services are <br />required per the shift and holiday coverage detailed in Section II below. The regular hours of <br />operation at the corporate yard are Monday through Friday from 6:00 a.m. to 6:00 p.m. <br />1. SCOPE <br />The City's objective is to provide the Yard with security guard service to monitor the security of <br />personnel, equipment, buildings, and general property. The security guard will be posted at the <br />guard station located at the Center Street entrance. The guard station is equipped with a closed- <br />circuit TV and provides visual monitoring of the Yard area and allows monitoring of the <br />entrance. <br />II. RESPONSIBILITY OF CONTRACTOR <br />The Contractor is to provide one security guard, unarmed, in standard full uniform at the Guard <br />Station located on the west side of the Corporate Yard. <br />Shift Coverage: <br />Monday-Thursday 6:00 a.m. to 8:00 p.m. <br />Friday night starting at 4:00 p.m. with coverage until Monday at 6:00 a.m. <br />Holiday Coverage: <br />The following 11 holidays are observed by the City of Santa Ana. Full 24 hour security guard <br />coverage is required on these holidays. <br />1. New Year's Day <br />2. Martin Luther King Jr. Birthday <br />3. Presidents Day <br />4. Memorial Day <br />5. Independence Day <br />6. Labor Day <br />7. Veteran's Day <br />8. Thanksgiving and the Friday following <br />9. Christmas and the last working day before the holiday <br />The security guard shall perform the following: <br />25C-17
The URL can be used to link to this page
Your browser does not support the video tag.