My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - ENERGY EFFICIENCY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
05/02/2011
>
25D - AGMT - ENERGY EFFICIENCY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:45:41 PM
Creation date
4/28/2011 11:06:24 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
5/2/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
93- <br />Briggs Electric, Inc. <br />14381 Franklin Ave <br />Tustin CA 92780-7010 <br />(949) 863-9901 <br />010-207836 <br />January 26, 2011 <br />Siemens Industry <br />10775 Business Center Drive <br />Cypress, CA 90630 <br />Attention; Tim Bearman <br />From; Ron Calkins <br />Reference. Spurgeon Park Gear Replacement <br />Change Order 03 <br />Briggs Electric Change Order #3 is the price to remove the two existing distribution boards <br />serving the ball fields lights at Spurgeon Park and replace them with new. The new boards will <br />match the same items in the existing gear with the one exception of an added compartment for <br />the Musco lighting control panels. The concrete pad will be extended to fit the size of the new <br />switchgear. The existing wire is assumed to be in good condition for reuse. If required, short wire <br />extensions will be added to the existing wire within the panels. Replacing of the existing wire is <br />excluded. The installation of the Musco panels including wiring is excluded from this price. <br />Permits and plans are excluded from this price. <br />Total Price $32,478.00
The URL can be used to link to this page
Your browser does not support the video tag.