My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - ENERGY EFFICIENCY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
05/02/2011
>
25D - AGMT - ENERGY EFFICIENCY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:45:41 PM
Creation date
4/28/2011 11:06:24 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25D
Date
5/2/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 000 <br />MU S <br />?W' <br />100 11, Ave West • PO Box 808 • Oskaloosa, IA 52577 <br />Phone: (800) 825-6020 0 Fax: (888) 397-8736 <br />January 11, 2011 <br />Siemens Building Technologies Inc <br />Attn: Tim Bearman <br />10775 Business Center Drive <br />Santa Ana, CA 90630 <br />Re: Control-Link Cost Estimate - Delhi Park <br />Dear Tim Bearman, <br />Here is the Control-Link Estimate that you requested for Delhi Park. This quote includes the following... <br />Equipment <br />Note: At this site we will use the controller that was purchased for Cabrillo Tennis and was not <br />installed due to changes at the tennis center. <br />? (1) Remote Equipment Controllers (RFC's) <br />? (7) Remote Off/On Auto Switches <br />? (1) Remote Switch Box <br />? (4) 30 Amp Contactors <br />? (1) 16" x 16" x 6" Junction Box <br />? (2) 12" Din Rail <br />? (1) 2' x 4' piece of '/4" plywood <br />Zone 1: Baseball Zone 2: Basketball <br />Zone 3: Handball Zone 4: Security <br />Zone 5: Restroom Exterior Zone 6: Restroom Interior <br />Zone 7: Spare <br />? 10 year warranty on all equipment <br />? All freight costs <br />Equipment Price $7,700.00 <br />Equipment Credit from the Cabrillo Tennis Control-Link $6,000.00 <br />Total equipment price less credit $1,700.00 <br />Equipment Installation <br />? Turnkey installation of all components by Musco Technicians <br />? Activation and testing of systems to ensure all units are fully functional and operational <br />Installation Price S2,900.00 <br />10 Years Control Link Central Service (CLC) <br />? 24/7 toll free access to CLC customer scheduling operators <br />? Access to Musco Control Link Scheduling Website <br />REC operations and Website Training for your scheduling staff <br />Total Equipment & Installation with 10 years of Service: $4,600.00* <br />Price assumes contactors exist. If contactors are required, they can be purchased at <br />an additional cost to be installed by others. <br />*Please add applicable sales tax. Freight has been included. <br />Please feel free to call me to discuss any questions or concerns that you may have. <br />Sincerely, <br />25D-8
The URL can be used to link to this page
Your browser does not support the video tag.