Laserfiche WebLink
Chapter 2 CEQA Findings <br /> <br /> <br />Impact Statement <br /> <br />Evidence/Rationale Supporting Findings <br /> <br />Mitigation Measures <br /> <br />Findings Level of <br />Significance after <br />Mitigation <br /> that could conceal material remains (e.g., <br /> worked stone, fired clay vessels, faunal bone, <br /> hearths, storage pits, or burials) are <br /> discovered during any project-related earth- <br /> disturbing activities (including projects that <br /> would not encounter undisturbed soils), all <br /> earth-disturbing activity within 100 feet of the <br /> find shall be halted and the City of Santa Ana <br /> shall be notified. The project applicant shall <br /> retain an archaeologist who meets the <br /> Secretary of the Interior's Professional <br /> Qualifications Standards for Archaeology to <br /> assess the significance of the find. Impacts to <br /> any significant resources shall be mitigated to <br /> a less-than-significant level through data <br /> recovery or other methods determined <br /> adequate by the archaeologist and that are <br /> consistent with the Secretary of the Interior's <br /> Standards for Archaeological Documentation. <br /> Any identified cultural resources shall be <br /> recorded on the appropriate DPR 523 (A-L) <br /> form and filed with the SCCIC. <br />Impact 4.4-2 Long-term The Agency believes that through the MM4.4-2(a) Prior to any earth-disturbing Finding 1 Less than <br />cumulative development potential grading for future project activities (e.g., excavation, trenching, grading) The Agency finds that changes or alterations Significant <br />occurring pursuant to the construction impacts would potentially that could encounter undisturbed soils, the have been required in, or incorporated into, the <br />Transit Zoning Code has the occur to paleontological resources. project applicant shall retain a professional project which would avoid or substantially <br />potential to directly or However, implementation of MM4.2-2(a) paleontologist to determine if the project could lessen the significant environmental effect as <br />indirectly destroy a unique and MM4.2-2(b) would reduce the impact directly or indirectly destroy a unique identified in the final EIR. <br />paleontological resource or to less than significant through pre- paleontological resource or site or unique <br />unique geologic feature. grading study as well as by providing geologic feature. The investigation shall <br /> provisions to preserve resources that are include, as determined appropriate by the <br /> encountered unexpectedly. paleontologist and the City of Santa Ana, a <br /> paleontology records check and a pedestrian <br /> Discussion is provided on pages 4.4-20 survey of the area proposed for development. <br /> The results of the investigation shall be <br />2-20 Revised Station District Project and FOIL Settlement Agreement Findings of Fact/Statement of Overriding Considerations