My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIGNATURE CONTRACTORS
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
SIGNATURE CONTRACTORS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:12:49 PM
Creation date
5/5/2011 10:48:20 AM
Metadata
Fields
Template:
Contracts
Company Name
Signature Contractors
Contract #
10-7558
Agency
Public Works
Council Approval Date
5/2/2011
Expiration Date
3/30/2012
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-� <br />i <br />CITY OF SANTA ANA <br />/ PROJECT NO. 10 -7558 CENTENNIAL PARK RESTROOM ROOF REPLACEMENT <br />PROPOSAL &z CONTRACT AGREEMENT <br />BID. "PROPOSAL <br />x <br />TO: CITY COUNCIL. `OF THE CITY OF SANTA ANA <br />FROM: c- �l � /� A��C�CZ..Vs � d rJ� �G� (Z. � . <br />REQUIREMENT: <br />The undersigned declares that he/she has carefully examined the location of the proposed work, that <br />he /she has examined the Plans and "Specifications and read the accompanying instruction to BIDDERS, <br />and hereby proposes to furnish all material and do all the work required to complete the said work in <br />accordance with said plans, specifications and special provisions, for the unit prices) or lump sums) set <br />forth in the following schedule: <br />Item # <br />Bid Item <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />PROJECT 10 -7558 Centennial Park Restroom Roof Shelter <br />1. <br />Demolition and Dispose <br />LS <br />1 <br />$ � +�� aa� � <br />$ � � �.�� <br />2. <br />24'x24' Shade Structure <br />EA <br />2 <br />$ �� �� � ' <br />$ 6 �a/� <br />3. <br />Concrete Sonatube Columns <br />EA <br />8 <br />$ �� ' <br />$ G �7 � <br />4. <br />Concrete Sonatube Footings <br />EA <br />8 <br />$ % l <br />$ S, yG� 8 <br />5. <br />Welded Wire Mesh <br />LF <br />120 <br />$� ®� � <br />$ %o�L L 7 L <br />6. <br />Electrical per structure (J -Box, flood <br />� <br />/3(fa <br />� � a <br />lights with wire vandal proof cover, <br />EA <br />2 <br />$ <br />$ <br />electrical wire, and conduits) <br />7. <br />Emergency Work On Time and <br />LS <br />1 <br />$ 10.000 <br />$ 10.000 <br />Material Basis <br />TO BE INCLUDED IN BID PACKAGE <br />BP 1 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.