My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AIR PRODUCTS AND CHEMICALS, INC. 1-2011
Clerk
>
Contracts / Agreements
>
A
>
AIR PRODUCTS AND CHEMICALS, INC. 1-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:33:05 AM
Creation date
5/11/2011 10:29:42 AM
Metadata
Fields
Template:
Contracts
Company Name
AIR PRODUCTS AND CHEMICALS, INC.
Contract #
N-2011-057
Agency
FINANCE & MANAGEMENT SERVICES
Expiration Date
3/31/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specifications, temporary supply requirements, soil bearing capacity, special design requirements, <br />requirements for union labor, special cleaning requirements, special piping codes such as ANSI, special <br />installation or maintenance procedures, or special site restrictions. <br />Civil- <br />10. Provide a suitable site that meets all of the requirements of NFPA 55 (latest edition) or NFPA 52 (2005 <br />edition). Air Products' technical representative must inspect and approve the installation site prior to <br />Buyer's initiation of any civil work. <br />11 . Provide any site preparations (site clearance, grading, roads, paving, landscaping, etc.), as required <br />12. Provide adequate vehicle access to and from the installation site. Notify Air Products of any delivery <br />restrictions or delivery windows. <br />13. Provide foundation and equipment pads per specifications supplied by Air Products. Recommended <br />foundation for HF-150 is reinforced concrete or asphalt. <br />14. Provide protective posts (e. g. crash bollards), as required by the AHJ, to protect the system from vehicular <br />traffic and third parties. <br />Electrical- <br />15. Provide explosion proof electrical equipment,. where required, within 15' (NFPA 55) or 1 O' (NFPA 52) of any <br />portion of the HF-150 system. Reference the National Electric Code (NEC), latest revision, per Class 1, <br />Group B, Division II, locations. <br />16. Provide adequate lighting for the installation area for night deliveries and system maintenance. <br />17. Provide electrical cable and/or conduit from the HF-150 to an emergency stop location if location is desired <br />outside of 25' reach of Weller-provided emergency stop cable_ <br />18. Provide '/a" diameter x 6' long ground rod -ITT Weaver Type WB '/< at Emergency stop location for trailer <br />ground. Test using a megger ground tester. Resistance must not exceed 5 ohms. <br />F. SCHEDULE <br />On-site time required to commission supply system: One (1) day <br />_it_
The URL can be used to link to this page
Your browser does not support the video tag.