My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT - ENVIRONMENTAL SERVICES - 200 E FIRST AMERICAN WAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
05/16/2011
>
25G - AGMT - ENVIRONMENTAL SERVICES - 200 E FIRST AMERICAN WAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2013 1:34:58 PM
Creation date
5/12/2011 11:25:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
5/16/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Consulting Services (200 East First American Way) i City of Santa Ana <br />TIA Task 2: Data Collection and Research <br />¦ Visit the project study area to confirm existing conditions with respect to existing site development, local area <br />development, site access, parking use, and areas of congestion in order to verify our overall understanding of <br />traffic conditions in the area that might affect this project. <br />o Document the existing roadway striping, traffic control measures, curbside parking restrictions, adjacent <br />intersection configurations, and other pertinent roadway features. <br />¦ Obtain existing street improvement plans/striping plans for key roadways in the immediate vicinity of the <br />project site. Compile information with regards to planned street improvements in the project study area. <br />¦ Conduct AM peak period and PM peak period traffic volume counts at up to fifteen (15) study intersections. <br />The traffic counts will be conducted between the hours of 7:00 AM and 9:00 AM and 4:00 PM and 6:00 PM. <br />These traffic volume data will be utilized in the traffic impact analysis for the project. The number and location <br />of the study intersections will be verified with City staff prior to commencement of the analysis. Should traffic <br />and analysis of additional intersections be required (i.e., more than 15 intersections), an amendment to the TIA <br />scope and budget will be necessary. <br />¦ Conduct 24-hour machine traffic counts at up to fifteen (15) roadway segments to support the Greenhouse <br />Gas, Air Quality and Noise analyses. <br />e Research data at the City of Santa Ana, adjacent jurisdictions and recent traffic impact studies prepared for <br />developments in the project vicinity regarding the status of other proposed developments (related projects) in <br />the area that may contribute cumulative impacts to the adjacent street system and study locations in the <br />vicinity of the proposed project. The compiled list of related projects will be forwarded for review and <br />approval by City staff. <br />rt Obtain development information for the remaining vacant portion of the 3-acre parcel to include as a related <br />project in the cumulative traffic setting. <br />TIA Task 3: Trip Generation, Distribution, and Assignment <br />¦ Prepare trip generation forecasts for the proposed project for a typical weekday over a 24-hour period, as well <br />as for the commuter AM and PM peak hours. The trip generation forecasts will be derived from trip rates <br />listed in Trip Generation, 8 h Edition, published by the Institute of Transportation Engineers (ITE) in 2008. <br />Appropriate trip generation credits will also be applied for the existing land uses on site, mixed-use <br />development, and transit, if applicable. <br />¦ Assign the forecasted AM and PM peak hour trips expected to be generated by the proposed project to the <br />study intersections based on existing and anticipated traffic patterns to and from the project site, and input <br />from City staff. The assumed distribution pattern will be submitted for review and approval by City staff prior <br />to finalization. <br />¦ Prepare trip generation forecasts for the related projects for a typical weekday over a 24-hour period, as well <br />as for the commuter AM and PM peak hours utilizing the ITE Trip Generation publication. The AM and PM <br />peak hour trips expected to be generated by the related projects will be distributed and assigned to the local <br />street system. <br />TIA Task 4: Formulation of Existing Plus Project, Near-Term, and long-term Traffic Volumes <br />¦ Develop daily, AM peak hour and PM peak hour "existing plus project" traffic volume projections for 15 <br />intersections and 15 roadway segments. <br />¦ Develop daily, AM peak hour and PM peak hour "near-term" traffic volume projections based on the <br />application of an annual growth factor to the existing traffic volumes plus the addition of related project <br />traffic plus the addition of Project traffic for 15 intersections and 15 roadway segments. <br />Use of disclosae of data contained on this sheet is subject <br />to ilia restriction on the tide page of this proposal. <br />Page 11 <br />25G-23
The URL can be used to link to this page
Your browser does not support the video tag.