Laserfiche WebLink
• Construct New Foundation] RepairBuildingShell <br />Developer/contractor is responsible for constructing the new foundation; for placing and securing the <br />dwelling on the foundation; formakingall repairsto the buildingshell resultingfrom the move; and <br />for connectingall utilities. <br />• Demolition Old Foundation} <br />Developer/contractor is respansible for demolishing and removing the existingfaundation, <br />footings and underground utilities, <br />Important Milestone: <br />The Agency anticipates that the contract will be approved by City Council on May 16, X011. The dwelling at <br />6,13 Fr Sixth Street must be moved from its current location before June ~4 ZU11, The dwelling can be moved <br />and stored on the recer'ver site whsle the plans, specifications and engineering are ber"ng developed and <br />appravedr <br />61DA612 E. Fifth Street <br />Description: Duplex ~Approx.1,6~6 SF~ <br />Receiver Site: 6~2 E. Sixth Street, Santa Ana <br />Summary of Services; <br />• Geotechnical Survey <br />Developer/contractor is responsible for obtaining a qualified geotechnical firm to conduct a <br />geotechnical survey of the receiver site and to monitor the compaction and grading. <br />• Compaction and Grading <br />Developer/contractor is respansible for performing all compaction and grading at the receiver site, <br />• Architectural Plans, Specifications and Engineering <br />Developer/contractor is responsible for procuring all required architectural plans, specifications and <br />engineering farthe relocation and newfoundation; and forsubmitting said plans, specifications and <br />engineering to the City's Planning and Building Agency for review and approval. The plans, <br />specifications and engineering must be prepared and stamped by qualified personnel. <br />• Relocate Dwelling <br />Developer/contractor is respansible for relocating the dwelling. The relocation must be performed by <br />qualified personnel in accordance with the House Moving Code and all required codes, standards and <br />regulations. <br />• Construct New Foundation <br />Developer/contractor is responsible for constructing the new foundation; for placing and <br />securing the dwelling on the foundation; for making all repairs to the building shell resulting from the <br />move; and for connecting all utilities, <br />• Demolition bald Foundation & Garage} <br />Developer/contractor is responsible fordemolishingand removingthe existingfoundation, <br />footings, garage, flatwork and underground utilities, <br />DEVELOPER/CONTRACTOR MUST 51GN AND DATE THE SCOPE 01" WORK AND INCLUDE IT IN THEIR PROPOSAL. <br />PROPOSALS THAT DO NOT CONTAIN THE SIGNED SCOPE 0~ WORK WILL 8E CQNSIDERED NaN-RE5PONSIVE AND REJECTED, <br />Developed Contractor Name tPrintj <br />Devefoperf Contractor Signature <br />Page 2~~Sc~e wark~ <br />Date <br />EXHIBIT 2 <br />