My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04 - Contract - Interior Demolition Inc - 8 Properties
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2010-2012
>
2011
>
05/16/2011
>
04 - Contract - Interior Demolition Inc - 8 Properties
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:32:29 PM
Creation date
5/16/2011 9:27:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
04
Date
5/16/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARCEL. -Sol E, Santa Ana Boulevard & 707 Ne Garfield Street <br /> APN 398-303-04 <br /> Address: 8Q1 Santa Ana Blvd. and 707 N. Garfield Street <br /> Description.: Front Building ~1 Unit}, Rear Building ~1 Unit}, Attached Garage <br /> Parcel SF: 5,000 <br /> Total SF of Buildings, Approx,1,370 does not include garage} <br /> Summary of 1Nork: Remove and dispose of the asbestos-containing material identified in the Asbestos & <br /> Lead Survey in accordance with SCAQMD Rule 1403. <br /> Demolish and dispose of remove all buildings and accessary structures. Item includes <br /> foundation and footings; Demolish and dispose ofall underground utilities located on <br /> the parcel; Demolish and dispose ofall paving and landscaping. Preserve all ofthe <br /> baundaryfencing. <br /> All metal and concrete shall be recycled. Utilities shall be properly capped at the <br /> property line and approved signed-off by the City's Building Department. All holes or <br /> depressions resultingfrom the demolition shall be filled with clean imported soil and <br /> compacted, The overall site shall be rough graded sa that it drains properly. <br /> No Sa Ivag-e Alternate <br /> EVERY PAGE 01" THE SCOPE 0~ WORK MUST BE SIGNED BY THE CONTRACTOR AND INCLUDED IN THEIR PROPOSAL. <br /> PROPOSALS THAT Dq NOT CONTAIN THE SIGNED SPECS It111LL BE CONSIDERED NON-RESPONSIVE AND REJECTED. <br /> <br /> Contractor's Name ~Print~ Contractor's Signature Date <br /> Page 9 9,~c~~f V~ork} ~~,H~iT ~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.