My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GILBANE BUILDING COMPANY 2-2011
Clerk
>
Contracts / Agreements
>
G
>
GILBANE BUILDING COMPANY 2-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:30:44 AM
Creation date
5/23/2011 10:04:57 AM
Metadata
Fields
Template:
Contracts
Company Name
GILBANE BUILDING COMPANY
Contract #
N-2011-060
Agency
COMMUNITY DEVELOPMENT
Insurance Exp Date
6/30/2011
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Scope of Services <br />City of Santa Ana Scope of Services -Revised 3/IO/II <br />Please find below the proposed scope of services to be provided by Gilbane Building Company <br />("Contractor") during the Pre-Construction Phase for the City of Santa Ana Community Center located on <br />SAUSD's Garfield Elementary School Campus. <br />Gilbane Building Company ("Contractor") will perform these services in aLease-Leaseback capacity for <br />the City of Santa Ana. All The Contractor's initial Work shall consist of its services in connection with <br />the Pre-Construction Phase, and the development of a Guaranteed Maximum Price for Construction. All <br />costs (material, labor, overhead, fees, contingencies, etc.) associated with Construction will be <br />incorporated into the final GMAX and are not included as part of this proposal. Pre-Construction Services <br />shall be parallel to and coincide with the Construction Document sub-phases of the Design Professional's <br />Services. <br />Project Management: Gilbane will provide typical project management services including but not <br />limited to: attending meetings, creating and issuing meeting minutes, participating and assisting the <br />Design Team and Owner with needed approvals for the project, assisting the Owner with Soft and Hard <br />cost budgets and allocations, develop and maintain a master project schedule. <br />Estimating: Gilbane shall perform a Program and Budget Verification with information presented by the <br />City of Santa Ana and Santa Ana Unified School District. In addition, Gilbane will prepare this <br />verification estimate in a format consistent with that used by Design Professional and Client, or in a <br />format otherwise mutually agreed upon prior to the cost estimate preparation. <br />Constructability /Value Engineering 8c Analysis: Constructability and Value Engineering is part of the <br />broader goal of obtaining optimum value for each dollar the Client spends on the Project. Constructability <br />and Value Engineer reviews will be presented to with the goal of defining options for the City that will <br />maximize their budget. <br />Cost of Services: $ 23.200.00 <br />8
The URL can be used to link to this page
Your browser does not support the video tag.