My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (22) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (22) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:28:00 PM
Creation date
5/23/2011 11:14:14 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
A-2011-058
Agency
Public Works
Council Approval Date
3/7/2011
Expiration Date
10/31/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT NO. 1-2447 <br />EXHIBIT E <br /> Appendix - Complete List of Project Deliverables <br />OCTA <br /> Original Current <br /> Completion Completion <br />Schedule Date Date <br />Pre-Preliminary Engineering <br />Study Initiation including: Purpose and Need <br />Statement <br />Alternatives Analysis including: Conceptual <br />Alternatives, Detailed Alternatives and Operating <br />Plans, Final Alternatives and Operating Plans, <br />Baseline Alternative <br />Completion of AA including: Alternatives <br />Analysis Final Report, LPA Selection by Grantee <br />Board, LPA Adoption b MPO <br />NEPA Sco ing Report <br />Ridership Modeling including: Travel Forecast <br />Document, Documentation of Methodologies and <br />Assumptions, Summit Reports and Maps, Travel <br />Forecasts Template, Annualization Factor <br />Justification, User Benefit C Worksheet - <br />Before and After Study: Before and After Study <br />Plan, Documentation of Methods, "Predicted" <br />Results, Identification of Responsible Contractors <br />Draft EIS / EA Documents including: Public <br />Hearing and Comment, Draft EIS / EA report, <br />ADA Compliance <br />New Starts (NS) Templates and Certifications <br />including: Project Description Worksheet (Temp <br />1), Project Maps (Vicinity and State), Self Cert of <br />Tech Methods, PL Assumptions, Project <br />Development Procedures (Temp 2), Project <br />Justification (Temp 3-7, 9-12), Baseline Approval, <br />SCC Annualized Cost Worksheets, Land Use <br />Supporting Information, Making the Case <br />Document <br />Project Cost - Summary of O&M Cost <br />Assumptions/ Productivities including: Capital <br />Cost in SCC Format, Capital Cost in Original <br />Format, <br />Scope - Project Plans and Drawings, Design <br />Criteria, Concept Design Drawings and <br />Specifications, Documentation of passenger level <br />boarding concept
The URL can be used to link to this page
Your browser does not support the video tag.