My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (22) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (22) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:28:00 PM
Creation date
5/23/2011 11:14:14 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
A-2011-058
Agency
Public Works
Council Approval Date
3/7/2011
Expiration Date
10/31/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-1-2447 <br />EXHIBIT G <br />Small Starts/Very Small Starts Reporting Checklist <br />The following checklist is provided to aid project sponsors in preparing applications to enter into <br />project development for Small Starts and Very Small Starts. Specific information and <br />instructions regarding reporting Templates, Standardized Cost Categories, Summit reports, <br />financial plans, etc., are provided in much greater detail in the FTA guidance at its website for <br />New Starts Pro'ect Planning and Develo rnent. <br /> Very <br /> <br />Reporting Item <br />Required Information Small Starts Starts <br />Small <br />;videpce of.Ilastc Project Readiness <br />Alternatives Analysis Report Final Report <br />Selection oFthe Locally Preferred Alternative and Proof of local action <br />Adoption into Constrained Lon Range Plan <br />Agreement on Baseline Alternative FTA concurrence <br /> Ridership and cost inputs and <br />initial Information for Before and After Study estimates <br />NE RA Scoping (as appropriate to the NEPA Class of Scoping report or memorandum <br />ncuvu <br />Preliminary Project Management Ptan, <br />Evidence of Sponsor Technic-at Capacity and/or other materials <br />Project I2ackground <br />Project Description <br />Make the Case Document <br />and <br />Narrative, Data, Maps, Graphics <br />Assum tions <br />Project Maps,_ <br />Project Site Map Map <br />Vicinity Map Map <br />Standard Cost Categories, including schedule, inflation, SCC Worksheets <br />and funding <br />Annualized Cost Worksheets for Build and Baseline SCC Worksheets <br />Travel Forecasts* " <br />User Benefits Forecasts Summit Reports _ <br />Thematic Maps and Legend Summit Output <br />Trove{ Forecast Template, Narrative, <br />Summary of Travel Forecasts Data (as necessa <br />01M Costs <br />Summary of O&M Cost Productivities Narrative, Data <br />* Simplified travel forecasting procedures and results may be acceptable. Sponsors should discuss such procedures <br />with FTA. <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.