Laserfiche WebLink
EXHIBIT "C" <br />SROEMALK <br />t <br />/ ? ?? FFL41 , ' <br />?A <br />{PR <br />OAPPROACHIVEr <br />it ° ? FJ? N <br />i <br />PROPOSED <br />SIDEWALK <br />OAR <br />i s <br />DWOW <br />e t <br />I i• I <br />i, iPROPOSEO DECORATIVE + <br />1 CONCRETE PLAZA <br />1 ?x ,g ? f 1 I ?? <br />?rt ?I <br />- J i, <br />?I f i ?CA01.1. <br />4 or ? <br />x <br />r r <br /> <br /> CONSTRUCTION COORDINATION + <br /> <br />- NOTIFICATION 2 WEEKS PRIOR TO ENTIRE <br /> PROJECT START <br />- NOTIFICATION 48 HOURS PRIOR TO <br /> WALGREENS SITE SPECIFIC CONSTRUCTION <br />E - DRIVEWAY ACCESS WILL REMAIN AT ALL <br /> TIMES <br />- LARGE BUISNESS OPEN DURING CONSTRUCTION" <br /> SIGNS WILL BE POSTED <br />- CONSTRUCTION OF ENTIRE PROJECT WILL BEG IN <br /> AROUND MAY 2011 <br />J- DETAILED SCHEDULE OF WORK FOR THE NE <br /> CORNER PROVIDED PRIOR TO CONSTRUCTION <br /> START <br />E? <br /> <br /> <br /> <br /> <br /> <br /> <br />• GRA E EX?STING <br />LAN CAP NG T <br />r <br /> O <br />CK OF <br />MA C WA ` <br />04 <br /> l x <br />ii <br />'S (RIGHT OF ENTRY) <br /> <br /> Ww <br />J~ <br />Q? <br /> UC <br /> via <br />rEXISTINC Paint TREE • WALGREENS IS RESPONSIBLE FOR <br />TO REMAIN REWORKING IRRIGATION A$ NECESSARY <br />PROPOSED PALM TREE <br />WAL REEK <br />EXIS TO REMAIN TREE i <br />i <br />PROPOSED PALM TREE 5 E p I <br />LANOSCAPEITOIBE <br />CONCRETE PLAZA <br />(RIGHT OF ENTRY) <br />ITO ;kATCH <br />,? .., <br />SANTA AVA --- iAll f= <br />D ?,?D BRISTOL / 17TH WIDENING <br />`.J WALGREENS COORDINATION ~`---?