My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MASTER LANDSCAPE AND MAINTENANCE, INC. 1D - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
MASTER LANDSCAPE AND MAINTENANCE, INC. 1D - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2017 9:25:18 AM
Creation date
5/24/2011 2:23:57 PM
Metadata
Fields
Template:
Contracts
Company Name
MASTER LANDSCAPE AND MAINTENANCE, INC
Contract #
A-2011-042
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
2/22/2011
Expiration Date
6/30/2011
Insurance Exp Date
4/2/2012
Destruction Year
2017
Notes
Amends A-2007-140; 01; A-2009-094; A-2010-099
Document Relationships
MASTER LANDSCAPE AND MAINTENANCE, INC. 1 - 2007
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
MASTER LANDSCAPE AND MAINTENANCE, INC. 1A - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
MASTER LANDSCAPE AND MAINTENANCE, INC. 1B - 2009
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
MASTER LANDSCAPE AND MAINTENANCE, INC. 1C- 2010
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
decomposed granite, asphalted concrete paved areas. Edging/detailing <br />shall be performed at the same time mowing occurs. Chemical detailing <br />of turf may occur with the Director's approval. If chemical detailing is <br />performed, the Contractor shall use the string trimmer to remove the <br />treated turf within one (1) week after symptoms of phytotoxicity become <br />recognizable. <br />(1) The Contractor shall use the McClain's edger to edge straight lines <br />along fences, walls, or long flowing arcs. The Director's <br />Representative may require the Contractor to use string lines to <br />edge straight lines if the Contractor's staff fails to achieve this <br />quality without this method. <br />(2) The Contractor shall detail around trees, along walls/fences and <br />other park amenities first using a sharpened shovel cut to establish <br />a concentric round circle around trees, poles, etc. Once the initial <br />detailed circle is established a string trimmer may be used to <br />maintain the circle. Should the circle begin to deform the Director <br />shall direct the Contractor to repeat the detail process. <br />(3) The Contractor shall detail turf not greater than 10" away from <br />walls or fences. Detail lines shall be made straight and shall be <br />maintained straight. The Contractor shall, at his own cost, supply <br />top soil and an approved turf seed to reduce any existing bare soil <br />areas along walls/fences that are greater than 10". <br />c) Fertilization <br />(1) Casual Turf - Contractor shall apply fertilizer four (4) times per <br />year at a rate specified in the City's Agronomic flan (see <br />Attachment 3) with Nitra King 19-4-4 during fall-winter and Lesco <br />39-0-0 during spring-summer months. <br />(2) Sport Turf/Priority - Contractor shall apply fertilizer seven (7) <br />times per year per the City's Agronomic Plan" (see Attachment 3) <br />using a complete or approved fertilizer. The rate of application <br />shall be at a rate specified in the City's Agronomic Plan. The <br />Director may request proof of fertilizer application in the form of <br />empty fertilizer bags. <br />d) Irrigation-all turf <br />(1) Contractor shall ensure irrigation schedules are constantly <br />monitored to provide adequate moisture in the soil for healthy turf, <br />and avoid excess wet conditions. <br />9
The URL can be used to link to this page
Your browser does not support the video tag.