My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MASTER LANDSCAPE AND MAINTENANCE, INC. 1D - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
MASTER LANDSCAPE AND MAINTENANCE, INC. 1D - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2017 9:25:18 AM
Creation date
5/24/2011 2:23:57 PM
Metadata
Fields
Template:
Contracts
Company Name
MASTER LANDSCAPE AND MAINTENANCE, INC
Contract #
A-2011-042
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
2/22/2011
Expiration Date
6/30/2011
Insurance Exp Date
4/2/2012
Destruction Year
2017
Notes
Amends A-2007-140; 01; A-2009-094; A-2010-099
Document Relationships
MASTER LANDSCAPE AND MAINTENANCE, INC. 1 - 2007
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
MASTER LANDSCAPE AND MAINTENANCE, INC. 1A - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
MASTER LANDSCAPE AND MAINTENANCE, INC. 1B - 2009
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
MASTER LANDSCAPE AND MAINTENANCE, INC. 1C- 2010
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. <br />15. <br />16. <br />General Maintenance and Clean-up For All Parks and Contracted Sites <br />a) All trash and debris on the ground or in trash receptacles shall be removed <br />from all worksites each day Monday through Sunday before 12:00 p.m. <br />This includes all landscape areas, paved areas, street curb gutters, flood <br />control channels, etc. <br />b) The contractor shall rake, hand remove, or vacuum leaves that are not <br />absorbed by planting. This shall be done as often as required to maintain a <br />neat appearance. <br />c) After heavy windstorms or other inclement weather that impacts sites <br />under this agreement, the Contractor shall bring in extra staff to clean all <br />parks areas within two (2) days at no cost to the City. Debris, such as but <br />not limited to, litter, fallen branches, trash, limbs, branches, soil erosion, <br />etc., shall be removed from the worksites. <br />d) The Contractor shall keep sidewalks and all other paved areas swept and <br />free of any debris, dirt, glass, weeds, leaves, etc. at all times. <br />e) Drain inlets shall be checked and if necessary cleaned once per day to <br />avoid flooding of areas during inclement weather. <br />Other Requirements <br />a) Work Not Scheduled <br />The Director may delete a portion of or the entire work site from <br />contractual maintenance during a construction period or any period where <br />the Director determines that work cannot be scheduled. The deletion of <br />this portion of work will be reflected as a reduction in the monthly <br />payment to the Contractor. The amount of reduction will be based on the <br />percentage of area involved and agreed upon by the City and the <br />Contractor in writing. <br />Special Maintenance <br />a) City of Santa Ana Corporation <br />maintenance operation center. <br />Landscape Specification the <br />performed. <br />n Yard - The Corporate Yard is the city's <br />In addition to the standard Grounds- <br />following special maintenance shall be <br />(1) All trash receptacles shall be emptied daily five (5) days per <br />week and replaced with new trash liners. The Contractor shall <br />install trash liners so as not to be seen on the exterior of the <br />receptacles. The Contractor shall be responsible for replacing <br />24
The URL can be used to link to this page
Your browser does not support the video tag.