My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MASTER LANDSCAPE AND MAINTENANCE, INC. 1D - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
MASTER LANDSCAPE AND MAINTENANCE, INC. 1D - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2017 9:25:18 AM
Creation date
5/24/2011 2:23:57 PM
Metadata
Fields
Template:
Contracts
Company Name
MASTER LANDSCAPE AND MAINTENANCE, INC
Contract #
A-2011-042
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
2/22/2011
Expiration Date
6/30/2011
Insurance Exp Date
4/2/2012
Destruction Year
2017
Notes
Amends A-2007-140; 01; A-2009-094; A-2010-099
Document Relationships
MASTER LANDSCAPE AND MAINTENANCE, INC. 1 - 2007
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
MASTER LANDSCAPE AND MAINTENANCE, INC. 1A - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
MASTER LANDSCAPE AND MAINTENANCE, INC. 1B - 2009
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
MASTER LANDSCAPE AND MAINTENANCE, INC. 1C- 2010
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 4 <br />ANNUAL COLOR PLANTING AND MAINTENANCE SPECIFICATION <br />Before each annual planting the area should be tilled 8 to 16 inches deep. Organic matter in the <br />form of nitrified redwood must be incorporated to a depth of 8" of the top soil. The contract <br />administrator may adjust this if adequate organic matter is already present in the soil but the <br />successful bidder must be prepared to incorporate this organic matter at every color rotation. <br />Organic matter must comprise 25% of the soil volume where the roots will be. This requires 2" <br />of nitrified redwood tilled to an 8" depth. Apply 1.5 pounds of nitrogen per 1000 sq. ft. as a <br />complete low nitrogen material with a ratio of 1:2:1, 1:1:1, 1:2:2 or similar. Do not use a higher <br />rate of nitrogen as this may result in excessive vegetative growth and a suppression of flowering. <br />After establishment, fertilize as necessary to maintain a robust appearance and maximum <br />flowering. After incorporating organic material and other supplements, the beds must be raked <br />smooth and slightly mounded. Sticks clods and other material must be removed from the bed. <br />During planting gently crush the root mass with the fingers to stimulate root growth in the <br />surrounding soil. Begin planting in the center of the bed and keep traffic in the worked soil to a <br />minimum. Make the hole slightly larger than the root ball and set the plant at the same depth or <br />slightly higher than it was growing in the container. Smooth out the soil around the plants after <br />planting, including footprints. Water plants to a depth of 5 inches immediately after planting for <br />4" plant material (deeper for larger pots). <br />Plants are to be rotated four times a year and are to be kept disease free and healthy on a <br />consistent basis. There must be no dead or missing plants at any time and the beds must be kept <br />in a weed free condition. Plants will be in 4" pots and will be planted in an 8" triangular spacing <br />pattern. Rows must be in a straight alignment at the time of planting. Plant species that may be <br />planted at different times of the year may include but not be limited to the following annual <br />bedding plants: <br />• Spring/Summer - April through October 1 <br />Alyssum, Lobelia, Salvia, Marigold, Gloriosa daisy, Penstemon, Cosmos, Dahlia, Impatiens, <br />Begonias, Double Impatiens, Petunia, Verbena, Vinca rosea (periwinkle) Zinnias <br />Fall/Winter <br />Iceland poppies, Pansies, Viola, Stock, Snapdragons, Primroses, Ranunculus <br />Vandalism <br />Contractor shall check annual color beds daily (Monday through Friday). If plants are missing or <br />vandalized, the Contractor shall provide the City's representative with a proposal to replace <br />missing/damaged plants. After the City's Representative signs the proposal, the Contractor shall <br />then replant/replace missing/damaged plants within 48 hours. <br />The City's contract administrator shall be the sole judge of whether the above specifications are <br />met. The contract administrator shall also approve the types and combinations of color bedding <br />plants prior to installation.
The URL can be used to link to this page
Your browser does not support the video tag.