My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
110509_2011-07_2624SHickory
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2011
>
110509_2011-07_2624SHickory
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2012 2:49:23 PM
Creation date
5/25/2011 1:23:38 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP2011-06
Date
5/9/2011
Notes
2624 S Hickory St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CUP NO. 2011-06 <br />MAY 9, 2011 <br />PAGE 3 OF 4 <br />good faith to coordinate the use of frequencies and equipment with the <br />Communications Division of the Orange County Sheriff-Coroner <br />Department to minimize, to the greatest extent possible, any interference <br />with the Public Safety 800 MHz Countywide Coordinated Communications <br />System (CCCS). Similar consideration shall be given to any other existing <br />or proposed wireless communications facility that may be located on the <br />subject property. <br />7. At all times, the permit applicant shall not prevent the City of Santa Ana <br />from having adequate spectrum capacity on the City's 800 MHz radio <br />frequency. <br />8. Before activating its facility, the permit applicant will submit to a post- <br />installation test to confirm that "advanced planning and frequency <br />coordination" of the facility was successful in not interfering with the City of <br />Santa Ana Public Safety radio equipment. This test will be conducted by <br />the Communications Division of the Orange County Sheriff-Coroner <br />Department or a Division-approved contractor at the expense of the <br />applicant. This post-installation testing process shall be repeated for every <br />• proposed frequency addition and/or change to confirm the intent of the <br />"frequency planning" process has been met. <br />9. The permit applicant shall provide a 24-hour phone number to which <br />interference problems may be reported. This condition will also apply to all <br />existing facilities in the City of Santa Ana. <br />10. The permit applicant will provide a "single point of contact" in its <br />Engineering and Maintenance Departments to insure continuity on all <br />interference issues. The name, telephone number, fax number and a-mail <br />address of that person shall be provided to the City's designated <br />representative upon activation of the facility. <br />11. The permit applicant shall insure that lessee or other user(s) shall comply <br />with the terms and conditions of this permit, and shall be responsible for the <br />failure of any lessee or other users under the control of permit applicant to <br />comply. <br />12. The permit applicant shall provide a coverage and cell site location map for <br />each existing and proposed facility in Santa Ana. <br />n <br />LJ <br />Resolution Na. 2011-07 <br />Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.