My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - PARKING ANALYSIS CONSULTANT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
06/06/2011
>
25B - AGMT - PARKING ANALYSIS CONSULTANT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2016 4:17:35 PM
Creation date
6/2/2011 1:30:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25B
Date
6/6/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'+t <br />kv a <br />City ol'SanrtaAna <br />`r ,,<<� Comprehensive Parking Analysis <br />extensive outreach through three channels. First is general Following the completion of Tasks 1 and 2, Kimley -Horn will <br />public outreach through online surveying. Kimley -Horn will <br />develop, maintain, and tabulate an online survey tool. We <br />develop a draft report that summarizes the results of the <br />parking program evaluation and provides recommendations <br />have found that efforts of this type are best served through for improving program operations. Each recommendation <br />online survey mechanisms, which provide for greater will include a comparison of advantages and disadvantages, <br />portability of the study and allow for greater access and <br />easier tabulation of results. <br />implementation strategies, potential cost mitigation <br />strategies, and communication and education materials. <br />Second, Kimley -Horn will work with the City to identify a <br />project advisory committee that will be used throughout the <br />project process to identify issues, vet recommendations, <br />and generally provide oversight to ensure that the results of <br />the project are consistent with the vision of the City. <br />Third, Kimley -Horn will facilitate stakeholder outreach (four <br />meetings) to interact with key community stakeholders (as <br />Task 4 — Presentation to Stakeholders <br />Following the submission of the draft report, Kimley - <br />Horn will present the findings and recommendations <br />to community stakeholders and the project advisory <br />committee. <br />Task 5 — Presentation of Final Report <br />Following the presentation of the draft report and receiving <br />comments from the City, Kimley -Horn will compile the final <br />identified by the City). Kimley -Horn will prepare all materials, report for submission to the City. Kimley -Horn will also <br />including presentations, flyers, hand -outs, graphic <br />materials, meeting minutes, etc. <br />The results of the three public outreach channels will be <br />used in combination with the results from Task 1 to develop <br />specific recommendations and improvement strategies. <br />present the final findings and recommendations in two (2) <br />separate meetings to either City Council or City staff (or a <br />combination of both). <br />Task 6 — Monitoring and Follow -Up <br />As part of the existing analysis and development of <br />Task 3 — Draft Parking Analysis Report recommendations, Kimley -Horn will help the City establish <br />City of Santa Ana <br />8 7P770045.11 — and Associates, ocates,Inc. <br />I EXl'11�� '� <br />
The URL can be used to link to this page
Your browser does not support the video tag.