My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - PARK MAINTENANCE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
06/06/2011
>
25E - AGMT - PARK MAINTENANCE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:44:33 PM
Creation date
6/2/2011 3:36:41 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25E
Date
6/6/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(10) Perennial/Annual Color: All perennial/annual color beds shall be maintained and planted/rotated three (3) <br />times per year (first week of January, May and September) as detailed in Attachment 2. <br />(11) Fertilization: Cyads and Palms shall be fertilized two (2) times per year (first week in March and <br />September). <br />b) Santa Ana Stadium - The historic Santa Ana Stadium is a premier youth football and soccer venue. In <br />addition to the standard Grounds-Landscape Specification the following special maintenance shall be <br />performed. <br />(1) All pedestrian hardscape areas, including but not limited to, grandstand bleachers, ramps, tunnels, and <br />sidewalks, shall be blown and/or swept clean daily seven (7) days per week. <br />(2) All parking lots, safe dispersal areas, vehicular drop-off areas, etc. shall be blown and/or swept clean once <br />per week (Thurdays). Trash shall be picked daily. <br />(3) All site amenities, including but not limited to, signage, player benches, hand railing, , public telephones, <br />etc. shall be completely wiped clean with a germicidal cleanser and polished to a high luster with an <br />approved product on Friday of each week. <br />(4) All grandstand bleachers shall be inspected continuously and wiped clean as stains and dust appear. <br />(5) All turf in the Stadium area is considered priority turf. <br />(6) All surfaces within the Stadium (including tunnels, bleacher area, all walkways, seats) shall be high <br />pressure washed quarterly (the third Monday of the months of July, October, January and April) to remove <br />all stains, gum, candy, etc. <br />c) City of Santa Ana Corporation Yard - The Corporate Yard is the city's maintenance operation center. In <br />addition to the standard Grounds-Landscape Specification the following special maintenance shall be <br />performed. <br />(1) All trash receptacles shall be emptied daily five (5) days per week Monday - Friday and replaced with <br />new trash liners. The Contractor shall install trash liners so as not to be seen on the exterior of the <br />receptacles. The Contractor shall be responsible for replacing missing trash receptacle lids and interior <br />waste receptacles when missing. Lids and interior waste receptacles shall be provided by the City. Lids <br />shall be completely wiped clean with a germicidal cleanser continuously as stains and dust appear. <br />(2) All cigarette urns shall be sifted daily Monday, Wednesday and Friday. The sand in the cigarette urns <br />shall be fresh and leveled. Contractor shall replace cigarette urn sand with #20 white silica sand as needed <br />to maintain a clean, debris free appearance. <br />(3) All turf at the Corporation Yard is priority. <br />d) McFadden Technology Center and Newhope Libraries. In addition to the standard Grounds-Landscape <br />Specification the following special maintenance shall be performed. <br />(1) Parking lots, entrance to buildings, City sidewalks immediately in front of the property and all other <br />hardscape surfaces shall be cleaned free of debris and hosed down with a garden hose and high-pressure <br />nozzle daily. <br />(2) Trash enclosures shall be cleaned and hosed down with a garden hose and high-pressure nozzle one time <br />per week. <br />(3) Vines shall be trimmed at a height to be determined by the Director to prevent graffiti. <br />e) P.E. Bike Trail (Chestnut to Bristol). In addition to the standard Grounds-Landscape Specification the <br />following special maintenance shall be performed. <br />(1) Adams to Bristol - The contractor shall keep the unimproved areas immediately adjacent the improved <br />bike trail free of weeds, debris, and otherwise any objectionable item a minimum of 4' from fence lines <br />and/or to the wall of adjacent buildings. <br />22X.46
The URL can be used to link to this page
Your browser does not support the video tag.