Laserfiche WebLink
RESOLUTION 2011-444 <br />REVENUE <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />SECTION XI PUBLIC WORKS AGENCY <br />086 1 7002-5 1704 Paving, including Earthwork <br /> (0 - 2000 sq. ft.) <br /> (Over 2000 sq. ft.) <br />08617002-51704 Fencing <br /> Masonry, Concrete or Block <br />08617002-57006 Street Trees <br /> By Developer, Inspection Only <br />08617002-51704 Permanent Street Patch Guarantee <br /> Refundable if done in 30 calendar days <br />08617002-51704 Projects Exceeding $50,000 & <=$100,000 and/or <br /> Work items not included here <br />08617002-51704 Projects Exceeding $100,000 and/or <br /> Work items not included here <br />08617002-57006 Overtime Rate for Construction Inspectors <br /> Construction Inspector overtime rate range. Actual overtime <br /> hourly - rate based on Inspectors salary step <br />08617002-56305 Certificate of Correction <br />08617002-56305 Covenants, Conditions, & Restrictions; Agreements and <br /> Miscellaneous Checking <br />06817002-53710 Notice of Abatement- Standard Administration Fee <br />06817002-53710 Notice of Abatement- Multiple Postings in a 12-month Period <br />06817002-56203 Sign Removal from Public Right of Way <br />06817002-53719 Sanitation Charge <br /> Bimonthly <br /> Single Family <br /> Duplex <br /> Triplex <br /> Fourplex or larger <br /> Business <br /> NOTE: Any portion of a building which is designed <br /> to be separately rentable and is separately identifiable <br /> by a letter or number designation shall constitute a <br /> separate and distinct unit, except that any publicly- <br /> owned building shall be a single unit. <br />086 1 7002-5 1704 Survey Monument Check: 1st Monument Check <br /> Additional monument <br />08617002-51704 Uninitiated Street Work Permit <br /> PROPOSED <br /> FY 10-11 FY 11-12 <br />UNIT FEES FEES <br />Sq. Foot 0.36 0.36 <br />Sq. Foot 0.26 0.26 <br />Minimum 142.00 143.56 <br />Linear Foot 1.52 1.54 <br />Minimum 127.58 128.98 <br />Each 172.00 173.89 <br />Sq. Foot 32.14 32.49 <br />Percent of estimated <br />construction costs 9.59% 9.59% <br />Percent of estimated <br />construction costs 7.00% 7.00% <br />Per Hour 59.35-63.87 51.78-59.18 <br />Per Hour 158.00 159.74 <br />Per Hour 158.00 159.74 <br />Each 350.00 353.85 <br />Each 58.00 58.64 <br />Per Sign 26.81 27.10 <br />Per Unit 14.91 14.91 <br />Per Unit 14.91 14.91 <br />Per Unit 14.91 14.91 <br />Per Unit 14.91 14.91 <br />Per Unit 14.91 14.91 <br />Each 803.00 811.83 <br />Each 161.00 162.77 <br />Per Permit Double Street Work Double Street Work <br />Permit Fee Permit Fee <br />76