My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - TELEPHONE SYS MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
06/20/2011
>
25A - AGMT - TELEPHONE SYS MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:43:40 PM
Creation date
6/14/2011 5:28:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25A
Date
6/20/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
able to <br />• Completed preventive maintenance checklists will be ? Yes ? No <br />provided to the City Telecommunications Coordinator <br />on a monthly basis. <br />• At least once a month, perform regular system backups & Li Yes ? No <br />_ system de-fragmentations on all telephone systems. <br />• Maintain an adequate on-site inventory of spare OEM ? Yes Li No <br />parts for repairs and replacements. <br />¦ The Vendor will identify the amount and type of ? Yes Li No <br />storage space it prefers. Actual storage space to be <br />provided by City will be determined by the City <br />Telecommunications Coordinator. <br />• Respond on-site within four hours (excluding weekends La Yes ? No <br />and holidays) of Vendor's receipt of the City's service <br />request when Minor Repairs are necessary during normal <br />City working hours (8-5). <br />¦ Minor Repairs should be completed within twenty- ? Yes ? No <br />four (24) hours. <br />• Respond on-site within 30 minutes of the City's Li Yes Li No <br />notification by the Telecommunications Coordinator or <br />his/her designee in case of Major System Failure during <br />normal City working hours (8-5), <br />¦ In case of Major System Failure, before or after ? Yes Li No <br />normal City working hours (8-5), or on weekends or <br />days observed by the City as holidays, the Vendor <br />shall respond on-site to notification of major failures <br />within two (2) hours of said notification. <br />¦ Major System Failure repairs should be completed Li Yes ? No <br />within twenty-four (24) hours. <br />¦ In the event that the Vendor has not repaired a Li Yes ? No <br />Major System Failure within twenty-four (24) hours, <br />Vendor will provide and install on site loan <br />equipment at no additional cost to the City, within <br />forty-eight (48) hour after failure notification. <br />¦ The City Telecommunications Coordinator or his/her ? Yes Li No <br />designee will determine the designation of any repair <br />as either Minor or Major. <br />• Serve as agent on the City's behalf for all telephone Li Yes ? No <br />company associated service and repair issues. <br />• Provide for use by the on-site technician (and all ? Yes Li No <br />substitute or supplemental technicians) a portable or <br />laptop maintenance terminal for use in supporting the <br />Citv's telephone svstem. <br />24 <br />25A-34
The URL can be used to link to this page
Your browser does not support the video tag.