My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA - AGMT SCE ENERGY EFFICIENCY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
06/20/2011
>
20B - AA - AGMT SCE ENERGY EFFICIENCY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:43:34 PM
Creation date
6/16/2011 3:42:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
6/20/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana SOW v4.9 <br />review and approval. <br />4. Delivery of flat files (final draft) to CPM for <br />review and approval. IR Tool training plus 10 Calendar Days. <br />Task 2 - Strategic Plan Goal 4 <br />Strategic Plan Goal 4: Local governments lead their communities with innovative programs for <br />energy efficiency, sustainability and climate change. <br />1. Task 2 (Strategic Plan Strategy 4.1): "Adopt a climate action plan, energy action plan or <br />adopt energy efficient language into another policy document, such as a General Plan, to <br />reduce community greenhouse gas emissions with a focus on energy efficiency. The climate <br />action plan will be available to other jurisdictions." <br />2. Task 2A (Strategic Plan Task 4.1.4): "Conduct the energy efficiency savings analysis for an <br />annual Greenhouse Gas inventory for the City/ County." <br />3. Task 2B (Strategic Plan Task 4.1.2): "Customize CAP with energy efficiency language and <br />data." <br />Task 2.A - Develop the Baseline Greenhouse Gas Inventory including an Energy Savings <br />Analysis of the Baseline GHG for Both the Community and Municipal Operations <br />As part of the Program, Implementer will use both the local government operations protocol and <br />a community-wide protocol to help develop the baseline GHG inventory. Implementer will also <br />develop an energy savings analysis based on the baseline GHG inventory for both the <br />Community and Municipal Operations. Implementer will provide all materials developed under <br />this task to CPM for review and comment. <br />1. Report on Status of Implementer or Subcontractor to Support the Task: Implementer <br />will submit monthly reports to the CPM on the status of hiring the energy and <br />sustainability Subcontractor and the technical Subcontractor to conduct the baseline <br />GHG inventory, including an energy savings analysis for the baseline GHG; develop <br />the energy efficiency chapter of the climate action plan; and coordinate LEED <br />certification and California Green Building Code training. <br />2. Assessment and Planning Report for Conducting the Baseline GHG Inventory Including <br />the Energy Savings Analysis for the Baseline GHG for Both the Community and <br />Municipal Operations: Implementer will provide a plan to the CPM regarding the <br />general method and describe the quantitative methodology, data collection effort, <br />results to be reported and any software programs to be used to develop the baseline <br />GHG inventory, including the energy savings analysis. Within 2 Calendar Days after <br />Southern California Edison Company <br />Page: 5 <br />20B-35
The URL can be used to link to this page
Your browser does not support the video tag.