Laserfiche WebLink
RESOLUTION 2011 - # ## <br />PROPOSED <br />REVENUE <br />FY 10 -11 <br />FY 11 -12 <br />ACCOUNT <br />DEPARTMENT /MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />Projects prior to May <br />18, 2009, shall be subject to the fees indicated in Resolution 2009 -018 <br />51603 <br />4) <br />Each self - contained factory wired approved unit, such as <br />Each <br />10.45 <br />10.55 <br />home appliances, heaters, vegetable cases, drinking fountain, <br />heating appliances, multiple outlet assemblies, etc. <br />51603 <br />5) <br />Busways, special raceways, under floor ducts, trolley or <br />Each 100' <br />10.45 <br />10.55 <br />plug -in busways each one hundred (100) feet or fraction <br />thereof <br />51603 <br />6) <br />Fire alarm communications, data control systems, smoke <br />detectors and low voltage system: <br />Commercial (charge by number of devices): <br />0 - 10 total devices <br />Each <br />22.25 <br />22.50 <br />10 or more total devices <br />1.80 <br />1.82 <br />Each control panel, standby power supply panel, <br />annunciator panel or similar main piece of <br />control equipment for one of the above systems. <br />Each <br />10.45 <br />10.55 <br />Residential (charge by number of dwelling units): <br />Residential unit (1) <br />22.75 <br />23.00 <br />Each add'1 residential unit in a multiple - dwelling <br />occupancy <br />Each <br />13.65 <br />13.80 <br />Each add'1 residential unit over 20 in a hotel, motel, <br />boarding house or lodge <br />Each <br />8.25 <br />8.35 <br />51603 <br />7) <br />Dedicated circuit <br />Each <br />10.45 <br />10.55 <br />51603 <br />8) <br />Service Meters, Reset Meters, Subpanel, Switchboard, Motor <br />Control Center, or similar equipment changes or additions. <br />599 volts or less, under 400 amps. <br />Each Meter <br />31.60 <br />31.95 <br />599 volts or less, 400 amps and less than 1200 amps. <br />Each Meter <br />79.30 <br />80.00 <br />598 volts or less, 1200 amps and over. <br />Each Meter <br />159.15 <br />160.90 <br />51603 <br />9) <br />Signs and high - potential gas tube lighting, each <br />Each <br />31.60 <br />31.95 <br />Note: This shall include all necessary control equipment <br />51603 <br />10) <br />Swimming pool, fountain, spas, each <br />Each <br />69.90 <br />70.65 <br />51603 <br />11) <br />Above ground spas <br />Each <br />22.50 <br />22.75 <br />51603 <br />12) <br />Temporary power- construction: <br />For services supplying a temporary power pole, <br />Each <br />54.95 <br />55.55 <br />pedestal or piggyback <br />For a system of distribution and utilization of poles <br />Each Pole <br />10.45 <br />10.55 <br />for temporary construction power, each pole <br />51603 <br />13) <br />Temporary construction lighting: <br />500 lamps or less <br />4.70 <br />4.75 <br />Over 500 lamps <br />8.20 <br />8.30 <br />55 <br />