Laserfiche WebLink
RESOLUTION 2011 - # ## <br />REVENUE <br />ACCOUNT DEPARTMENT /MISCELLANEOUS FEE OR SERVICE <br />SECTION IX PLANNING & BUILDING AGENCY <br />Projects prior to May 18, 2009, shall be subject to the fees indicated in Resolution 2009 -018 <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />51604 MECHANICAL CODE <br />Any person desiring a permit required by the Mechanical <br />Code shall, at the time of filing an application, pay a fee <br />of $38.25. There is no minimum fee for the issuance of a <br />permit for single family residences and duplexes. The <br />minimum total fee for issuance of a permit for all other uses <br />shall be $62.50. <br />FEESCHEDULE <br />51604 1) For the installation or relocation of each forced -air or <br />gravity -type furnace or burner, including ducts and <br />vents attached to such appliance, up to and including <br />100,000 BTU /h <br />51604 2) For the installation or relocation of each forced -air <br />or gravity -type furnace or burner, including ducts <br />and vents attached to such appliance over 100,000 BTU /h <br />51604 3) For the installation or relocation of each boiler, compressor, <br />condensing unit or heat pump up to and including five <br />horsepower, or each absorption system to and including <br />100,000 BTU /h <br />51604 4) For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump over five <br />horsepower up to and including 30 horsepower or <br />for each absorption system over 100,000 BTU /h up <br />to and including 1,000,000 BTU /h <br />51604 5) For the installation, relocation of each boiler, compressor, <br />condensing unit or heat pump over 29 horsepower up to and <br />including 50 horsepower or for each absorption system over <br />1 ,000,000 BTU /h up to and including 1 ,750,000 BTU /h <br />51604 6) For the installation or relocation of each boiler, compressor, <br />condensing unit or heat pump over 49 horsepower, or each <br />absorption system over 1,750,000 BTU /h <br />51604 7) For each VAV control box or air handling <br />unit to and including 2,000 cubic feet per minute, <br />including ducts attached thereto <br />51604 8) For each VAV or air - handling unit over 2,000 cfm <br />Note: This fee shall not apply to an air - handling <br />unit which is a portion of a factory assembled <br />appliance, cooling unit, evaporative cooler or <br />absorption unit for which a permit is required else <br />where in this code. <br />51604 9) Outdoor dual packaged heating and cooling <br />57 <br />PROPOSED <br />FY 10 -11 FY 11 -12 <br />UNIT FEES FEES <br />Each Permit <br />Each <br />Each <br />Each <br />Each <br />Each <br />Each <br />Each <br />Each <br />Each <br />37.85 38.25 <br />61.80 62.50 <br />27.60 27.90 <br />39.40 39.85 <br />47.65 48.20 <br />47.65 48.20 <br />57.85 58.50 <br />79.30 80.00 <br />18.75 18.95 <br />27.60 27.90 <br />47.65 48.20 <br />