Laserfiche WebLink
RESOLUTION 2011 - # ## <br />REVENUE <br />15.80 <br />16.00 <br />ACCOUNT <br />DEPARTMENT /MISCELLANEOUS FEE OR SERVICE <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />Projects prior to May <br />18, 2009, shall be subject to the fees indicated in Resolution 2009 -018 <br />1.65 <br />1.67 <br />Up to 1,000 sq. ft. (93m) <br />9.35 <br />9.45 <br />Between 1,001 (93.1m2) and 2,000 sq. ft. (186m) <br />47.65 <br />48.20 <br />More than 2,000 sq. ft. (18m2) <br />9.35 <br />9.45 <br />plus per 1,000 sq.ft. (93m2) or fraction <br />18.75 <br />18.95 <br />thereof over 2,000 sq. ft. (186m2) <br />51611 <br />2) <br />For storage tanks (including related piping and <br />9.35 <br />9.45 <br />regulating devices): <br />9.35 <br />9.45 <br />Up to 750 gallons (3m3) <br />79.32 <br />80.00 <br />Between 751 (3m3) and 2,000 gallons <br />79.32 <br />80.00 <br />More than 2,000 (8m3) gallons <br />79.32 <br />80.00 <br />plus per 1,000 (4m3) or fraction thereof <br />79.32 <br />80.00 <br />over 2,000 gallons (8m3) <br />51611 <br />3) <br />For rock storage: <br />Up to 1,500 cu. ft. (42m) <br />Between 1,501 (42.1m3) and 3,000 cu. ft. (84m) <br />More than 3,000 cu. ft. (84m3) <br />plus per 1,000 cu. ft. (28m) or fraction <br />thereof over 3,000 cu. ft. (84m) <br />51611 <br />4) <br />Self- contained water heater (residential type) <br />51611 <br />5) <br />Water heater (commercial type) <br />51611 <br />6) <br />Heat exchanger <br />51611 <br />7) <br />Water piping replacement, each 100 feet <br />51611 <br />8) <br />Gas piping service, 1 -5 outlets <br />51611 <br />9) <br />Backflow prevention device <br />51611 <br />10) <br />For each appliance or piece of equipment regulated <br />by this code for which no fee is listed <br />51611 <br />11) <br />Inspections outside of normal business hours <br />(4 hour minimum charge for Holidays, Saturday <br />and Sunday inspections) <br />51611 <br />12) <br />Re- inspection fee assessed under provisions of the <br />Building Code <br />51611 <br />13) <br />Inspections for which no fee is specifically indicated <br />(minimum charge - one (1) hour) <br />51611 <br />14) <br />Additional plan review required by changes, <br />additions, or revisions to approved plans (minimum <br />charge - one (1)hour) <br />63 <br />PROPOSED <br />FY 10 -11 FY 11 -12 <br />UNIT FEES FEES <br />9.35 <br />9.45 <br />15.80 <br />16.00 <br />15.80 <br />16.00 <br />1.65 <br />1.67 <br />8.00 <br />8.10 <br />14.40 <br />14.55 <br />14.40 <br />14.55 <br />1.65 <br />1.67 <br />9.35 <br />9.45 <br />15.80 <br />16.00 <br />15.80 <br />16.00 <br />1.65 <br />1.67 <br />Each <br />9.35 <br />9.45 <br />Each <br />47.65 <br />48.20 <br />Each <br />9.35 <br />9.45 <br />Each <br />18.75 <br />18.95 <br />Each <br />18.75 <br />18.95 <br />Each <br />9.35 <br />9.45 <br />Each <br />9.35 <br />9.45 <br />Per Hour <br />79.32 <br />80.00 <br />Per Hour <br />79.32 <br />80.00 <br />Per Hour <br />79.32 <br />80.00 <br />Per Hour <br />79.32 <br />80.00 <br />