Laserfiche WebLink
ATTACHMENT NO. 3 <br />REVISED SCOPE OF DEVELOPMENT AND SCHEDULE <br />It is recognized that certain requirements specified in the original Scope of Development and <br />General Conditions attached to the Private Disposition and Development Agreement as of July <br />19, 2004, have been completed or complied with. The only remaining requirements are as <br />follows: <br />Project Description <br />The portion of the Property shown within the larger hash -lined area on the aerial photograph <br />attached hereto, comprised of approximately 111,035 square feet, shall be improved pursuant to <br />SD (Specific Development District) 60 standards, state, county and municipal codes and other <br />applicable construction requirements. The portion of the Property shown within the cross hashed <br />area on the aerial photograph attached hereto, comprised of approximately 54,114 square feet, <br />shall be improved by raising the existing grade of such area to create a surface level with the <br />remainder of the Property within the larger hash -lined area. This grading shall be accomplished <br />to provide sufficient drainage and shall be performed in accordance with all state, county and <br />municipal codes and other applicable construction requirements, including, but not limited to, <br />requirements of the City of Santa Ana's National Pollution Discharge Elimination System <br />permit. The concrete at the driveway located at the northwest most portion of the Property shall <br />be repaired. Construction of such improvements shall be completed by July 1, 2016. The <br />Developer shall secure all applicable approvals and permits. <br />Refuse <br />An enclosed refuse area or areas shall be provided at locations in accordance with the <br />requirements of the City of Santa Ana. Refuse areas shall be designed with building materials <br />compatible with those used for the other structures on the site. <br />Signs <br />All signage on the Site shall be only that which is permitted by the City of Santa Ana pursuant <br />the applicable zoning under SD -60 and subject to approval of Agency's Executive Director. <br />Utilities <br />The Developer shall be responsible for all utility relocation or installations on the Property; and <br />hookups to sewers, drains, water and gas distribution lines, electric, telephone and telegraph <br />lines; and for hookup to all other public utility lines. All utility services on -site shall be installed <br />underground or concealed within buildings and no mechanical equipment or meters shall be <br />exposed at ground level as required by the Santa Ana Municipal Code. <br />1 -21 <br />