Laserfiche WebLink
Water Main Breaks in 2011 <br />The following Water Main Breaks have occurred this year: <br />Date Location Mai <br />n <br />Size Materi <br />al <br />May 13 3666 S. Bristol St <br />(Irrigation) z" P.V.C. <br />April 25 2818 W. La Verne 8" C.I. <br />April 14 1220 E. Glenwood 12" D.I. <br />March 1o Russell/Birch 4" C.I. <br />March 8 2713 S. Pacific 8" C.T. <br />March 7 709 E. Avalon 6" C.I. <br />March 2 301 N. Linwood 6" CA, <br />Jan 26 2823 S. Bristol 16" D.I. <br />Jan 12 2031 N. Poinsettia 6" C.I. <br />Total thru May= 9 <br />-''?V?Tater Service Brea sin 20 1-1 <br />The following Water Service Breaks have occurred this year: <br />Date Size Material Date Size Material Date Size ( Material <br />May 25 1" Polyethylene Mar 12 Copper Jan 12 1" Polyethylene <br />May 17 1 1/2" Polyethylene Mar u _ 11/2" Polyethylene Jan 12 6" Cast Iron <br />May 3 Polyethylene Mar 8 1" Polyethylene Jan n Copper <br />Apr 28 1" Polyethylene Mar 7 2" Polyethylene Jan 6 1" Copper <br />Apr 28 1" Polyethylene Mar 3 6 Cast Iron <br />Apr 26 1" Polyethylene Feb 28 C Polyethylene <br />Apr 20 1" Copper? Feb 28 2" Copper Total thru May = 36 <br />Apr 20 1" Copper? Feb 24 1 Polyethylene <br />Apr 20 Polyethylene Feb 23 2 <br />__ Copper <br />_..... _..- <br />Apr n 11A" ----------- _- <br />Polyethylene _ _---- <br />Feb 17 2 <br />1 Copper <br />- <br />Apr 4 1" Copper Feb 17 3/4" Copper <br />Mar 30 11/2" Copper Feb 8 1" Polyethylene <br />Mar 23 1" Copper Feb3 1" Polyethylene <br />Mar 16 1" Polyethylene Jan 29 1 Polyethylene <br />Mar 15 3/4" Copper Jan 27 6 Cast Iron <br />Mar 15 1" Copper Jan 14 2 Copper <br />The Public Hearing opened at 7:14 p.m. The following spoke on the item: <br />Billy Leigh, opposed to the water rate increase. <br />Evelyn Bell, spoke on behalf of a condominium complex on McFadden <br />with over 100 units, opposed to water rate increase. <br />CITY COUNCIL MINUTES 6 JUNE 6, 2011