Laserfiche WebLink
Project Experience <br />Gene Autry Way (West)/1-5 HOV Interchange <br />and Highway Improvements <br />Anaheim, CA <br />This project completed Phase 2 of the Gene Autry Way (West)/I-5 HOV <br />interchange to 750 feet west, and Phase 3 of Gene Autry Way from 750 <br />feet west of Manchester Avenue to Haster Avenue. The project consisted <br />of extending the existing six lanes of Gene Autry Way West across the 1-5 <br />through to Haster Street. The proposed improvements included roadway <br />paving, curb and gutter, sidewalk, signalization, pedestrian facilities, <br />parking lot, raised medians, Mechanically Stabilized Embankment (MSE), <br />retaining walls, sound walls, utility relocations, drainage, landscaping and <br />irrigation, and a two-span cast-in-place box girder bridge. <br />Client <br />City of Anaheim <br />Service <br />Construction Management <br />Hill (as TCM Group) provided comprehensive construction management Reference <br />services including, but not limited to: resident engineering, structure Mark Vukojevic, PE <br />City Engineer/Public Works Director <br />engineering, construction inspection, material testing, surveying, City of Anaheim <br />environmental monitoring, Primavera scheduling, contract administration, 714.765.5176 <br />constructability review, claims review/avoidance, quality control, and <br />document control for the project including construction contract, contract <br />plans, project special provisions, files, and project documents. <br />Mountain View Avenue Widening __ -- <br />Loma Linda, CA <br />Hill (TCM Group) provided comprehensive construction management services <br />for the construction of the Mountain View Avenue Grade Separation Widening <br />project, including, but not limited to: resident engineering, construction <br />inspection, construction engineering, contract administration, constructability <br />review, contract change orders review, CPM scheduling, quality control, <br />structure engineering, office engineering, document control, final estimates, <br />and material acceptance testing. In addition, we requested independent <br />assurance testing and construction surveying. <br />Construction consisted of widening Mountain View Avenue roadway by one <br />additional lane on the East side of Mountain View Avenue between Prospect <br />Avenueand Van Leuven Street. The project included the widening of Mountain <br />View Avenue Overhead Bridge and the San Timoteo Creek Bridge, roadway <br />reconstruction and resurfacing, traffic signal, sewers and drainage systems, <br />and storm drainage systems. The project required construction of various <br />cast-in-place retaining walls, concrete block retaining walls, MSE walls, <br />installation of an 18"waterline, installationand modificationofvariousstorm <br />drain systems, irrigation system modifications, street lighting, traffic signal <br />Service <br />Construction Management <br />Reference <br />Jarb Thipejr, City Engineer/ <br />Public Works Director <br />City of Loma Linda <br />909.208.4271 <br />h1111 City of Santa Ana I Public Works Agency Page 1 11 <br />First Street Bridge Replacement I Construction Management <br />Client <br />City of Loma Linda