My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL ENGINEERING AND CONTRACTING, INC. 5 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
ENVIRONMENTAL ENGINEERING AND CONTRACTING, INC. 5 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 5:05:02 PM
Creation date
6/27/2011 9:45:35 AM
Metadata
Fields
Template:
Contracts
Company Name
EEC ENVIRONMENTAL, INC.
Contract #
A-2011-102
Agency
PUBLIC WORKS
Council Approval Date
4/4/2011
Expiration Date
3/31/2012
Insurance Exp Date
10/31/2014
Destruction Year
2020
Notes
Amended by A-2011-102-01, -02, -03
Document Relationships
ENVIRONMENTAL ENGINEERING & CONTRACTING, LLC 5C - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
ENVIRONMENTAL ENGINEERING AND CONTRACTING, INC. 5A - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
ENVIRONMENTAL ENGINEERING AND CONTRACTING, INC. 5B - 2013
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Should the City need support to develop or enhance the permit - mandated training courses EEC has <br />extensive experience in developing training courses and can assist with this of %rt. <br />2. Activity Outline <br />In order to meet the aggressive 2010 /2011 schedule with and estimated Counsel award date of April 4, <br />201 1, EEC activities will consist of the following <br />1. Data Management Staff will conduct a preliminary database review and <br />facility inventory QA/QC and prepare initial inspection lists for Field <br />Inspection staff: <br />2. Field Inspection Stab will be deployed to conduct initial facility <br />inspections. EEC will deploy 3-4 Field inspectors with the expectation <br />of each conducting 25 -35 inspections per week. Added inspection resources are available and will be <br />utilized to supplement field activities as required. <br />3. Data Management Staff will conduct a detailed database review and facility inventory QA/QC to <br />identify specific database upgrade needs. In coordination with City Staff, database upgrades will be <br />implemented and supplemental inspection lists will be prepared and provided to Field Inspection stafF <br />4. Data Management Staff will review and enter colleted inspection data into the updated NPDES <br />database on an on -going basis. <br />3. Project Schedule <br />'The 2010/2011 schedule is summarized below. A detailed schedule for 2010/201 1, as well as a preliminary <br />schedule for 201 l/2012, is provided in Appendix D. <br />• April 4 — Counsel ApprovaVProject Kick -off' <br />• April 5 thru April 15 — Preliminary Database and Facility Inventory Review <br />• April 18 thru June 30 — 2010/201 I Commercial /Industrial Inspections (including re- inspections as <br />needed) <br />EEC — Ssnta Ana NPDES Proposal � � 5 D � � � March 3, 201 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.