My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J & G INDUSTRIES, INC. 2 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
J & G INDUSTRIES, INC. 2 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 4:42:13 PM
Creation date
6/28/2011 10:06:57 AM
Metadata
Fields
Template:
Contracts
Company Name
J & G INDUSTRIES, INC.
Contract #
A-2011-097
Agency
PUBLIC WORKS
Council Approval Date
4/4/2011
Expiration Date
4/1/2012
Insurance Exp Date
11/1/2012
Destruction Year
2020
Notes
Amended by A-2011-250
Document Relationships
J & G INDUSTRIES INC. 2A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Request for Qualification - Demolition Services <br />field workers. J&G's consultant will periodically conduct site safety inspections. Results are <br />given to the Project Manager for directing changes. <br />Underground Service Alert will be contacted to have the location of utilities marked. The <br />Project Manager shall contact utility companies to coordinate any required utility terminations. <br />Where required, sewer capping will occur at the beginning of work. The Field Superintendent <br />will be on site at the time the agency is scheduled to inspect the utility termination. <br />Care shall be taken to perform the services so as not to endanger the safety of any person or <br />property. At the start of the CTO, the Field Superintendent will visually survey existing <br />improvements and utilities near the work site, in order to protect them from damage. Field <br />Superintendent will also visually survey the site for potential materials containing <br />regulated/hazardous wastes. The Project Manager will contact CSA of any findings. <br />As directed by the CSA, the Project Manger will use the CSA provided asbestos and lead -paint <br />survey to arrange for J&G's consultant to prepare an abatement plan for the asbestos and lead <br />containing materials removal and disposal. When an asbestos and lead-based paint survey <br />has been previously prepared, the Project Manager will arrange for J&G's subcontractor to <br />prepare an abatement plan. The abatement plan will be submitted to the SCAQMD for their <br />approval. The Project Manger shall confirm that all required licenses, permits and certifications <br />have been acquired for implementing the abatement plan. The Project Manager will submit the <br />SCAQMD approved abatement plan for CSA approval to proceed with its implementation. <br />Upon CSA's approval, J&G's abatement subcontractor will implement the abatement plan. <br />Field Superintendent will verify waste is properly manifested for disposal at proper facility. <br />Upon completion of abatement plan implementation, the Field Superintendent will conduct a <br />pre -demolition survey to identify: that the asbestos, lead, regulated and hazardous wastes <br />have been removed as per their abatement plans; verify monitoring records; verify proper <br />manifesting of waste disposal; visually verify no other hazardous materials are left in <br />demolition area; as required, verify site is secured by appropriate fencing; verify that <br />appropriate protection devices are in place, such as pedestrian protection canopy; verify <br />appropriate signing displayed (i.e. no trespassing, keep out demolition in progress, danger, <br />etc.); verify all utilities have been terminated; and erosion control measures are in place, as <br />needed and required. The Field Superintendent will use a checklist to complete the pre- <br />J&G Industries Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.