Laserfiche WebLink
City of Santa Ana <br />Request for Qualifications — Demolition Services <br />Project Schedule <br />CTOs are expected to be completed within the following schedule: <br />First 24-hour tasks (fencing, boarding, etc.) — 1 day <br />Notifications / Permits — 3 to 10 days <br />Mobilization (H&SP, SWPPP, USA, terminate utilities pre -demolition as required, <br />Asbestos/Lead Plan) — 3 to 7 days , <br />Asbestos/Lead Abatement — 2 to 5 days <br />Pre -demolition Survey — 1 day <br />Demolition (salvaging procedures, interior, structure) — 1 to 8 days <br />Site Backfilling / Grading — 1 to 3 days <br />Demobilization — 1 to 3 days <br />PROJECT DURATION — 13 to 38 days <br />Some tasks may run concurrently, which will shorten the project duration shown above. <br />Quality Control <br />J&G uses quality, schedule and budget control procedures in the office and field management <br />of each CTO. Project schedules and work sub -task costs are prepared to start each CTO. The <br />Project Manager will track the CTO schedule and budget by using project management <br />software. Schedule and budget updates will be provided to the OCTA as required. J&G office <br />staff assists the Project Manager in maintaining a project file (notification records, agency <br />points of contact, etc.) for each CTO. Project Manager will notify CSA to have all work <br />inspected within 24 hours of CTO work completion. The Project Manager will prepare all <br />required paperwork for final closure package and billing for the project. <br />J&G's project files will be available for inspections by the CSA, county, state and federal <br />representatives, and shall be submitted to the CSA when requested. <br />At the start of the CTO, the Field Superintendent will visually survey existing improvements <br />and utilities near the worksite, in order to protect them from damage. Field Superintendent will <br />also visually survey the site for potential materials containing regulated/hazardous wastes. The <br />J&G Industries Page 24 <br />