My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J & G INDUSTRIES, INC. 2 - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
J & G INDUSTRIES, INC. 2 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 4:42:13 PM
Creation date
6/28/2011 10:06:57 AM
Metadata
Fields
Template:
Contracts
Company Name
J & G INDUSTRIES, INC.
Contract #
A-2011-097
Agency
PUBLIC WORKS
Council Approval Date
4/4/2011
Expiration Date
4/1/2012
Insurance Exp Date
11/1/2012
Destruction Year
2020
Notes
Amended by A-2011-250
Document Relationships
J & G INDUSTRIES INC. 2A - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Request for Qualifications - Demolition Services <br />E. Cost and Price Proposal <br />CTO requests will be <br />received and reviewed by <br />Jim Cain, President of J&G. <br />Mr. Cain will negotiate the <br />work effort required to <br />complete the proposed <br />CTO with the CSA. <br />A cost total cost for the <br />CTO will be obtained using <br />the time and materials <br />rates presented both here <br />and on the Price Summary <br />Sheet, see Appendix C. <br />The hourly rates reflect all <br />costs and anticipated fees <br />for the contract duration, up <br />to a maximum of three <br />years. <br />All subcontractors will be at <br />cost plus 5% mark-up. <br />All materials, supplies, <br />disposal fees are at cost <br />plus 10% <br />Support vehicles are <br />included in hourly rate for <br />personnel category. <br />Project Manager/Principal <br />125.00 <br />___ $ <br />_115,00_ <br />Project,Manager/FieldSu�erintend9nt <br />Safety Officer <br />Field Superintendent <br />$_ <br />-� <br />95.00 <br />Office Manager _ _ _— - <br />$-_80.00 <br />Ouerator _ _ <br />_ $ <br />120:00 <br />Enq(neerin�/Envlronmental_ <br />l <br />$ <br />_ $ <br />- 80:00 <br />155.00 <br />ulLment <br />�E <br />973 Track Loader (bare rate__ <br />F980 Rubber Tires Loader are rate)_ <br />$ <br />100.00 <br />PC 400 Excavator _buck bare rate) <br />_ $ <br />_1_3_0_.00_ <br />Aftachmen ts: <br />$--- <br />30.00 _- <br />I Paddle Wheel <br />r- - -- --_ --- --- - --- - <br />Breaker <br />$30.00 <br />�- <br />$ <br />0 <br />95.00 <br />Pulverizer <br />$ <br />110.00 <br />j3r0MemberShear <br />___.______ <br />____ <br />$ <br />120.00_ <br />2nd Member Shear <br />$ <br />150_00 <br />Off Road 25 -Ton+ Rock Trucksj1b rq _ <br />_$ <br />11_5.00 <br />Bobcat Sid Steer Loader=bucket_LgTL <br />_ $ <br />70.00 <br />Attachments: <br />Breaker <br />i $ <br />45.00 <br />_ Shear _ <br />$ <br />_ 75.00 <br />Power Sweeper <br />---------- --__..._..------$---50.00 <br />-- <br />Backhoe <br />$ <br />50.00 <br />_ <br />Forklift <br />_ 1500.2000 Gallon Water Truck__ <br />$ <br />$ <br />300/day <br />300/dad__ <br />10,000 Gallon Elevated Water Tower <br />_ $ <br />3,500/mo <br />Lo Bed Charges_ — __$ <br />150_00___ <br />Hi _side End Dui___$ <br />——$ <br />110.00_- <br />Lo -side End Dumb_ <br />100_00_.__ <br />AG Industries Page 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.