Laserfiche WebLink
EXHIBIT B <br />Page 2 of 2 <br />Right of Way Consulting and Related Services <br />PRICE SUMMARY SHEET <br />Terms and Conditions (can't) <br />m, Expert Witness Time: Expert witness deposition and testimony will be charged at 2 times hourly <br />rates listed on the previous pages, with a minimum charge of four hours per day. <br />Outside Direct Costs (ODCs): Heavy equipment, subcontractor fees and.expenses will be invoiced <br />at cost plus 10%, unless bliled directly to and paid by client. <br />• Insurance and Limitation of Liability: These rates are predicated on standard Insurance coverage <br />r and a limit of Leighton's liability equal to our total fees for a given project. <br />•v Field Equipment List <br />e <br />Task <br />Equipment, Supplies and Materials <br />Unit Rate <br />8200 <br />Box of 10 soil drive -sample rings <br />S 125 per month <br />9594 <br />Caution Tape (1000 -foot roll) <br />15 each <br />9575 <br />Combination Lock or Padlock <br />15 each <br />9564 <br />Core Sample Boxes - <br />IS each <br />ry <br />9565 <br />Cutoff Saws, reciprocating, electric (Saws -All) <br />45 per day <br />9566 <br />D.C. Purging Pump, 3 gpm <br />25 per day <br />-� <br />9555 <br />DOT 55 gallon Containment Drum with lid <br />60 each <br />9567 <br />Dissolved Oxygen Meter <br />40 per day <br />m <br />9537 <br />Generator, portable gasoline fueled, 3,500 watts <br />75 per day <br />9538 <br />In -Situ Level Troll 500 (each) <br />50 per day <br />9539 <br />In -Situ Troll 9500 Low Flow Water Sampling Equipment <br />120 per day <br />9543 <br />Level B Protection (per person) <br />300 per day <br />9544 <br />Level C Protection (per person) <br />180 per day <br />9574 <br />Magnahelic Gauges, each <br />10'per day <br />srr <br />9511 <br />Mileage (current published IRS rate) <br />IRS rate/mile <br />9547 <br />Nitrile Gloves <br />15 per pair <br />m. <br />9522 <br />pH/Conductivity/Temperature Meter <br />45 per day <br />9562 <br />Photo -Ionization Detector (PID) <br />440 per week <br />m <br />9557 <br />Pump, Typhoon 2 or 4 Stage <br />45 per day <br />9512 <br />Service Vehicle Usage <br />150 per day <br />9581 <br />Slip / Threaded Cap, 2 -inch or 4 -inch diameter, PVC Schedule 40 <br />8 each <br />e'• <br />9593 <br />Snow Fence (100 -foot roil) <br />IS per day <br />9595 <br />Survey/Fence Slakes <br />5 each <br />9526 <br />Submersible Pump, 10 gpm, high powered Gmnfos 2 -inch with controller <br />160 per day <br />9527 <br />Submersible Sump/Transfer Pump, 10-25 gpm <br />45 per day <br />9582 <br />Threaded Cap, Schedule 40 PVC <br />15 per cap <br />•� <br />9585 <br />TedlarOa Bags <br />15 each <br />9586 <br />Traffic Cones (:525)Barricades (single lane) <br />40 per day <br />9556 <br />Tubing, clear vinyl 3/8 -inch diameter <br />.45g per foot <br />9528 <br />Turbidity Meter <br />70 per day <br />9548 <br />TyvekB Suit (each) <br />12 each <br />9529 <br />Vapor Sampling Box <br />40 per day <br />9588 <br />Visqueen, 6 -mil, 20 feet x 100 feet roll, 6 -mil <br />75 per roll <br />9536 <br />Water Level Indicator (electronic well sotmder) <300 feet deep well <br />40 per day <br />w <br />9597. <br />Double -Ring Infillrometer (ASTM D 3385-09) equipment <br />350 per day <br />"°. Page 36 of 36 <br />