Laserfiche WebLink
AECOM <br />AECOM <br />999 IN. Twin & Country Road, Orange. CA 92868 <br />T 714.567.25n1 F 714.567.2441 mwi.aecnm.com <br />February 10, 2011 <br />Mr. Jason Gabriel <br />City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, California 92702 <br />Dear Jason, <br />Subject: Fiesta Marketplace Parking Structure Final Design <br />This letter is AECOM's proposal for services associated with security upgrades at three City of Santa Ana <br />parking structures and architectural, structural, and security upgrades at the Fiesta Marketplace parking <br />structure. The basis of our scope of work is the assessment matrix prepared by the City and a field walk <br />on February 3, 2011. The field walk Included with City staff, AECOM staff, and a PCI manager. <br />For services related to the Fiesta Marketplace, AECOM prepared a proposal in June, 2010 which <br />included engineering and architectural services needed to prepare contract documents and construction <br />support for the Improvements listed in an assessment report dated May 21, 2010. It is my understanding <br />that those improvements will be incorporated into this project and this proposal therefore includes the <br />effort previously described plus some additional security enhancements. <br />Four parkinastructures are contained in this proposal and scope of work. They include: 3r° and Birch; 51" <br />and Main; 5 and Sturgeon (Fiesta Marketplace garage); and, 3r° and Broadway. <br />We have two subconsultants on our team: Nestor+Gaffney and the Structural Group. Structural Group <br />will provide inspection and repair of the post -tensioning tendons in the Fiesta Marketplace parking <br />structure and Nestor+Gaffney will provide architectural services for the same garage. <br />General Scope of Work Items <br />The scope of work for this proposal is to prepare contract documents for the Improvements described <br />below. The proposal does not Include seismic analysis or retrofit of any structures, fire sprinklers, parking <br />lot ingresslegress controls, or modifications to the sidewalks or public streets around the parking <br />structures. <br />In addition, video surveillance camera systems are not included in this proposal since the final decision of <br />whether to Include them has not yet been made. <br />The contract documents will be to City of Santa Ana standards and will include plans, specifications, and <br />contract provisions. It is assumed that the City's standard bollerplate contract document will be used as a <br />basis and updated with the project's information to form the final contract documents. This will be <br />performed by AECOM as part of this proposal. <br />The scope of work also Includes construction administration (CA). For this scope of work, CA is defined <br />as support to the City during the bid phase which Includes answering bid questions. CA also includes <br />periodic field visits during construction (four visits), answering of requests for information (RFIs), and. <br />reviewing shop drawings as called for in the technical specifications. The City will advertise, collect bids, <br />analyze bids, and award construction contract; this work in not included with this proposal. This proposal <br />does not include administration of the construction contractor's contract, daily or frequent inspections, <br />tracking of changes during construction, or oversight of the contractor's work. <br />