My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PINNACLE LANDSCAPE COMPANY - 2011
Clerk
>
Contracts / Agreements
>
P
>
PINNACLE LANDSCAPE COMPANY - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 11:03:33 AM
Creation date
6/30/2011 9:03:03 AM
Metadata
Fields
Template:
Contracts
Company Name
PINNACLE LANDSCAPE COMPANY
Contract #
A-2011-149
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/6/2011
Expiration Date
6/30/2012
Insurance Exp Date
7/13/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) The Contractor is responsible for inspecting all plant material on a continuous basis and, as necessary, treating <br />plant material to maintain optimum health of the plants. If any plant material (turf, groundcover, shrubs, trees) <br />dies without the Contractor diagnosing the plant and implementing efforts to restore the plant to a healthy and <br />attractive appearance, the City will assume the Contractor caused the plant death. Contractor will be required <br />to replace the plant with like species and size at no extra cost to the City. City is responsible for cost of <br />replacing plants lost to vandalism; however, Contractor must prove that it was vandalism that killed the plant. <br />In the case where turf is lost due to pest damage, the Contractors shall replace the area of turf lost with Pacific <br />Sod Greg Norman 1 Hybrid Bermuda (during spring/summer) and Pacific Sod Greg Norman I Hybrid <br />Bermuda that has been cropped over with Perennial Rye grass (during fall/winter). <br />7. Irrigation System Maintenance <br />a) General Responsibilities <br />(l) Contractor's Certified Irrigation Specialist shall use automatic or mechanical irrigation systems to irrigate all <br />landscape areas detailed in this Agreement. In the event the existing irrigation system fails to provide full <br />and proper coverage, the Contractor shall provide alternate irrigation with full and proper coverage to all <br />areas in the work site at no extra cost to the City. <br />(2) Newly planted trees, shrubs, ground cover and turf shall receive adequate water to promote normal healthy <br />growth. Proper berms or basins shall be maintained during plant establishment period. <br />b) Operation of Automatic Irrigation Controllers <br />Where the operation of automatic irrigation controllers is required, the Contractor shall: <br />(1) Not duplicate any coded City key furnished by the Parks, Recreation and Community Services Agency for <br />access and operation of the controller. <br />(2) Surrender all keys furnished by the Parks, Recreation and Community Services Agency at the end of the <br />contract period m at any time deemed necessary by the Director to prevent serious loss to the City of Santa <br />Ana. <br />(3) Protect the security of City property by keeping controller cabinet and building doors locked at all limes. <br />(4) Refrain fiom using locked premises for storage of materials, supplies or tools, except as approved by the <br />Director. <br />(5) Program normal irrigation between the hours of 10:00 p.m. and 4:00 a.m. unless alternative hours are <br />approved by City. <br />C) Water Conservation <br />(1) The Contractors Certified Irrigation Specialist shall meet once a month with Park Services to review the <br />City's Monthly Water Conservation Report to discuss water conservation strategies. These discussions may <br />include, but not be limited to, the Contractor turning off irrigation systems during periods of rainfall and <br />times when suspension of irrigation is desirable to conserve water while remaining within the guidelines of <br />the CAW. <br />(2) When Park Services determines that plant material (turf, groundcover, shrubs, and trees) must be irrigated, <br />all controllers shall be activated within twenty-four (24) hours. <br />
The URL can be used to link to this page
Your browser does not support the video tag.