My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PINNACLE LANDSCAPE COMPANY - 2011
Clerk
>
Contracts / Agreements
>
P
>
PINNACLE LANDSCAPE COMPANY - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 11:03:33 AM
Creation date
6/30/2011 9:03:03 AM
Metadata
Fields
Template:
Contracts
Company Name
PINNACLE LANDSCAPE COMPANY
Contract #
A-2011-149
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/6/2011
Expiration Date
6/30/2012
Insurance Exp Date
7/13/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Any damage to the City of Santa Ana, SAPRF, or private property, which has been <br />determined to be due to the Contractor's neglect, shall be corrected at no additional cost <br />to the City of Santa Ana or the SAPRF. <br />2.07 HOURS OF OPERATION <br />The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 p.m., <br />Monday through Friday. No work shall be performed on weekends or on City recognized <br />holidays without written SAPRF approval. <br />2.08 SPECIFICATIONS AND PLANS <br />The work performed shall be done in accordance with the Standard Specifications for <br />Public Works Construction, latest edition, hereinafter referred to as Standard <br />Specifications. In case of conflict between the Standard Specifications and this <br />Specification, this Specification shall take precedence over and be used in lieu of such <br />conflicting portions. <br />Where the plans or specifications describe portions of work in general tenns, but not <br />complete detail, it is understood that workmanship of the finest quality is to be used. <br />Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, <br />equipment and incidentals and do all the work involved in executing the contract. <br />2.09 CONSTRUCTION EQUIPMENT <br />The Contractor shall take all necessary precautions for safe operation of his equipment <br />and the protection of (lie public from injury and damage from such equipment. <br />2.10 SOUND CONTROL REQUIREMENTS <br />The Contractor shall comply with all local sound control and noise level rules, <br />regulations and ordinances that apply to any work performed pursuant to the Contract. <br />Each internal combustion engine used for any purpose on the job or related to the job <br />shall be equipped with a muffler of a type recommended by the manufacturer of such <br />equipment. No intemal combustion engine shall be operated on the project without said <br />muffler. Full compensation for conforming to the requirements of this section shall be <br />considered as included in the prices paid for the various contract items of work involved <br />and no additional compensation will be allowed therefore. Sounds, such as loud music, <br />that are not Mated to the project, shall be kept at levels so as to not disturb the general <br />public. <br />2.11 TRAFFIC CONTROL <br />The Contractor shall notify the SAPRF representative of intent to begin the contract work <br />at least five (5) days before work is begun. The Contractor shall cooperate with local <br />authorities relative to handling traffic through the areas and shall make arrangements <br />relative to keeping the working area safe and clear of vehicles. <br />When entering or leaving roadways carving public traffic, the Contractor's equipment, <br />whether empty or loaded, shall in all cases yield to public traffic. All traffic delineation <br />
The URL can be used to link to this page
Your browser does not support the video tag.