Laserfiche WebLink
(6) All trees below 15' shall be pruned four (4) times per year (first week in January, April, July, and <br />October) using hand shears and loppers. The intent is to prune the plant material without the average lay <br />person noticing the cuts. <br />(7) All shrubs requiring hedging shall be trimmed every two weeks. <br />(8) Replace all 52 state flags in the Plaza of the Flags the first week of January and July of each year. Flags to <br />be provided by City. <br />(9) All turf in the Civic Center area is considered priority turf. <br />(10) Perennial/Annual Color: All perenniaUannual color beds shall be maintained and planted/rotated three (3) <br />times per year (first week of January, May and September) as detailed in Attachment 2. <br />(11) Fertilization: Cyads and Palms shall be fertilized two (2) times per year (first week in March and <br />September). <br />b) Santa Ana Stadium - The historic Santa Ana Stadium is a premier youth football and soccer venue. In <br />addition to the standard Grounds-Landscape Specification the following special maintenance shall be <br />performed. <br />(1) All pedestrian hardscape areas, including but not limited to, grandstand bleachers, ramps, tunnels, and <br />sidewalks, shall be blown and/or swept clean daily seven (7) days per week. <br />(2) All parking lots, safe dispersal areas, vehicular drop-off areas, etc. shall be blown and/or swept clean once <br />per week (Thurdays). Trash shall be picked daily. <br />(3) All site amenities, including but not limited to, signage, player benches, hand railing, , public telephones, <br />etc. shall be completely wiped clean with a germicidal cleanser and polished to a high luster with an <br />approved product on Friday of each week. <br />(4) All grandstand bleachers shall be inspected continuously and wiped clean as stains and dust appear. <br />(5) All turf in the Stadium area is considered priority turf. <br />(6) All surfaces within the Stadium (including tunnels, bleacher area, all walkways, seats) shall be high <br />pressure washed quarterly (the third Monday of the months of July, October, January and April) to remove <br />all stains, gum, candy, etc. <br />c) City of Santa Ana Corporation Yard - The Corporate Yard is the city's maintenance operation center. In <br />addition to the standard Grounds-Landscape Specification the following special maintenance shall be <br />performed. <br />(1) All trash receptacles shall be emptied daily five (5) days per week Monday - Friday and replaced with <br />new trash liners. The Contractor shall install trash liners so as not to be seen on the exterior of the <br />receptacles. The Contractor shall be responsible for replacing missing trash receptacle lids and interior <br />waste receptacles when missing. Lids and interior waste receptacles shall be provided by the City. Lids <br />shall be completely wiped clean with a germicidal cleanser continuously as stains and dust appear. <br />(2) All cigarette ums shall be sifted daily Monday, Wednesday and Friday. The sand in the cigarette ums <br />shall be fresh and leveled. Contractor shall replace cigarette um sand with #20 white silica sand as needed <br />to maintain a clean, debris free appearance. <br />(3) All turf at the Corporation Yard is priority. <br />d) McFadden Technology Center and Newhope Libraries. In addition to the standard Grounds-Landscape <br />Specification the following special maintenance shall be performed.